Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the Pure Storage FAIS FlashArray-Implementation-Specialist Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam FlashArray-Implementation-Specialist Premium Access

View all detail and faqs for the FlashArray-Implementation-Specialist exam


788 Students Passed

87% Average Score

97% Same Questions
Viewing page 3 out of 8 pages
Viewing questions 21-30 out of questions
Questions # 21:

After performing a hardware upgrade from an //M20R2 to a //X20R3-EMEZZ, a customer wants to add a Direct Flash Modules data pack to replace the existing SAS Chassis Data Packs (2x 20TB DPs). What extra hardware is required?

Options:

A.

DFM Swing shelf

B.

SAS Swing shelf

C.

4-port ETH card

Questions # 22:

What are the interface names for a 4-port FC card in slot 1 in an XR2/3 array?

Options:

A.

FC0, FC1, FC2, and FC3

B.

FC4, FC5, FC6, and FC7

C.

FC5, FC6, FC7, and FC8

Questions # 23:

An Implementation Engineer is performing a hardware NDU from a fully populated FlashArray//X90R3 to a FlashArray//XL that already contains 20 DFM-Ds. The drive transfer is complete, and the //XL is still in SPM (Shelf Mode). What is the next step the Implementation Engineer should take to continue the upgrade?

Options:

A.

Hot swap and move each DMM into any open //XL slot.

B.

Evacuate and remove each DMM one-by-one then set aside.

C.

Evacuate DMM's as a datapack then install into any slot in //XL.

Questions # 24:

An Implementation Engineer performs a controller upgrade. What command should the Implementation Engineer run to check I/O health?

Options:

A.

purehost monitor --balance

B.

purehost list --all

C.

pureport list --initiator

Questions # 25:

An Implementation Engineer is deploying a FlashArray//XLR5 with two DirectFlash Shelves. The engineer wants to ensure the shelves are installed in the preferred PCIe slots to achieve optimal performance and support. Which PCIe slots should the Implementation Engineer use for connecting the DFS shelves?

Options:

A.

PCIe slot 1 for SH9, PCIe slot 7 for SH8

B.

PCIe slot 0 for SH8, PCIe slot 8 for SH9

C.

PCIe slot 0 for SH9, PCIe slot 6 for SH8

Questions # 26:

Prior to running the puresetup command, which command should an Installation Engineer run on a new install of a FlashArray//XR4 array?

Options:

A.

pureboot list

B.

cobalt check . py

C.

purehw list

Questions # 27:

If a Technical Support Engineer (TSE) is not available to perform health checks after an installation, what action should the Implementation Engineer take?

Options:

A.

Email the account team

B.

Update and close the case.

C.

Verify that Remote Assist (RA) is open and update the case.

Questions # 28:

A customer has filled out the Installation Workbook. The management IP information netmask is specified as “255.255.255.223” and the gateway is specified as “10.24.18.1”. What corrective action should be taken to reconcile the IP configuration?

Options:

A.

The gateway information should be changed to 10.24.18.223.

B.

The netmask value should be changed to 255.255.255.0.

C.

The netmask value should be changed to /23.

Questions # 29:

During a HWNDU, the Implementation Engineer initializes CT0 and runs health checks. They observe 12 fewer iSCSI connections compared to pre-upgrade results. While reviewing port speed and status, the output shows CT0.ETH14 at 0.00 b/s. What is the first action the Implementation Engineer should take to troubleshoot?

Options:

A.

Swap the SFP from CT0.ETH14 to the unused management port in CT0.ETH5 and re-check port speed.

B.

Ask the customer to verify which hosts have missing paths and have them reboot the affected hosts.

C.

Ensure the SFP in CT0.ETH14 is fully-seated on the array and re-seat if necessary.

Questions # 30:

An Implementation Engineer runs check start validate-array-health before starting a FlashArray//X70R3 to FlashArray//X70R5 HWNDU and receives code 60 alert indicating an unhealthy NVRAM module in CH0.NVB1. What action Should the Implementation Engineer take to resolve this?

Options:

A.

Disable the unhealthy NVRAM module and proceed With HWNDU after confirming there is no degraded data.

B.

Reseat the unhealthy NVRAM module, and then verify it is in a healthy status prior to proceeding with the HWNDU.

C.

Proceed with the HWNDU, the //X70 model has a four NVRAM configuration so the array still has redundancy.

Viewing page 3 out of 8 pages
Viewing questions 21-30 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.