Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the Pure Storage FAIS FlashArray-Implementation-Specialist Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam FlashArray-Implementation-Specialist Premium Access

View all detail and faqs for the FlashArray-Implementation-Specialist exam


788 Students Passed

87% Average Score

97% Same Questions
Viewing page 5 out of 8 pages
Viewing questions 41-50 out of questions
Questions # 41:

An Implementation Engineer is planning to add a DirectFlash Shelf to a FlashArray//XL with an existing DirectFlash Shelf. Which PCIe slot must be used for shelf connectivity?

Options:

A.

0

B.

4

C.

6

Questions # 42:

An Implementation Engineer is performing a FlashArray//XR4 to FlashArray//XL upgrade, and is preparing to remove the XR4 CT0 controller. Which command should the Implementation Engineer run to stop Purity after confirming CT0 is the secondary controller?

Options:

A.

purewes controller disable --purity --verify-mode secondary --verify-array ARRAY_NAME ct0

B.

purewes controller disable --purity --verify-mode primary --verify-array ARRAY_NAME ct0

C.

purewes controller setattr --disable --verify-mode secondary --verify-array ARRAY_NAME ct0

Questions # 43:

A customer has purchased a FlashArray//XL. What power cables are required in order to connect this array to rack PDUs?

Options:

A.

2 x C13/14

B.

4 x C13/14

C.

4 x C19/20

Questions # 44:

What upgrade scenario required an upgrade of power supplies?

Options:

A.

X10 > X50

B.

X50 > X70

C.

X50R2 > X50R3

Questions # 45:

When accessing the FlashArray GUI, which management IP address is recommended for use?

Options:

A.

CT1 management IP

B.

CT0 management IP

C.

Virtual management IP

Questions # 46:

An Implementation Engineer is installing the first DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. Which ports should the Implementation Engineer use for the connection?

Options:

A.

ETH 10/11

B.

ETH 0/1

C.

ETH 18/19

Questions # 47:

A customer has a DirectFlash Shelf installed on a FlashArray//X90R4. The 208V rack PDUs are full, but there are five 120V connections available at the top of the rack. What should the Implementation Engineer understand about powering the DirectFlash Shelf in this scenario?

Options:

A.

The Shelf requires at least 180V to operate and Will NOT power on With 120V.

B.

The shelf can be fully supported by 120V for the duration of its service life.

C.

The shelf can operate temporarily on 120V, but 208/240V should be used as soon as it's available.

Questions # 48:

When should a FlashArray support case be opened?

Options:

A.

Once an issue arises

B.

Once install is completed

C.

Before starting install

Questions # 49:

For FlashArray//XL, which PCIe card slot is reserved for control upgrades?

Options:

A.

5

B.

6

C.

7

Questions # 50:

What is the redundancy of the FlashArray//XL PSUs?

Options:

A.

1+1

B.

2+2

C.

3+1

Viewing page 5 out of 8 pages
Viewing questions 41-50 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.