Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the USGBC Leadership in Energy and Environmental Design (LEED) LEED-AP-ND Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam LEED-AP-ND Premium Access

View all detail and faqs for the LEED-AP-ND exam


742 Students Passed

96% Average Score

95% Same Questions
Viewing page 2 out of 3 pages
Viewing questions 11-20 out of questions
Questions # 11:

The LEED for Neighborhood Development project team needs to prepare a flood map as an exhibit tor an upcoming zoningcommissioning meeting. Which ofthe following government agencies provides this data?

Options:

A.

U.S. Environmental Protection Agency (EPA) or local equivalent for protects outside of the U.S

B.

Federal Emergency Management Agency (FEMA) or local equivalent for projects outside of the U.S.

C.

Department of Housing and Urban Development (HUD) or local equivalent for projects outside of the US

D.

U.S. Department of the Interior (DOI) or local equivalent for projects outside of the U.S.

Questions # 12:

Question # 12

What is the development footprint?

A)

Question # 12

B)

Question # 12

C)

Question # 12

D)

Question # 12

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Questions # 13:

Aneighborhood project pursuing LEED for Neighborhood Development certification has 10 existing single family homes and is planning to construct 25 new single family homes Which of the following is Hue in order for the project to comply with GIBc Minimum Building Energy Performance?

Options:

A.

GlBc Minimum Building Energy Performance does not apply to single family homes

B.

90% of all 25 new homes must show a 2% improvement over ANSI/ASH RABIESNA Standard 00.1-2010

C.

90% of all 35 new and existing homes must show a 5% improvement over ANSI/ASHRAE/IESNA Standard 90 1 -2010

D.

90% of Jill now homes must meet the requirements of LEED for Homos v4 Minimum Energy Performance prerequisite

Questions # 14:

Which of the following are eligible sources of renewable energy under Green Infrastructure and Buildings Credit. Renewable Energy Production?

Options:

A.

Passive solar heating strategies offsetting heating energy use

B.

Cogeneration of electricity and heat using mill residue biomass

C.

Geothermal energy used in conjunction with a ground-source Moat pump

D.

Photovoltaic energy generation purchased from an off-site location

Questions # 15:

A local zoning code limits density on a residentially-zoned 10-acre (four hectare) parcel to 65 total units The site la outside ofwalking distance to transit service.Howcould this project be eligible for Neighborhood Pattern and Design Prerequisite Compact Development?

Options:

A.

Dedicate 10% of the total land area as a public park

B.

Place 15% of the total land area in private roads and streets

C.

Include 15% of the total land area as a protected community open space easement

D.

Include a recreation building with a development footprint of at least 1.5 acres (0.6 hectare)

Questions # 16:

Winch of thefollowing rating method can beused to determine the performance of luminaires for Green Infrastructure and Buildings Credit. Light Pollution Reduction?

Options:

A.

edema index

B.

Light emitting diodes

C.

Backlight-uplight-glare

D.

illuminating Engineering Society. Stage A Evaluation

Questions # 17:

An undeveloped five acres (two hectare) site has a two-acre (0.8 hectare) area sloping al 50%. To achieve SmartLocation and Linkage Credit. Steep Slope Protection, what possible percentage ofthe site could be developed?

Options:

A.

50%

B.

65%

C.

75%

D.

90%

Questions # 18:

A LEED forNeighborhood Development project is going to temporarily reroute existing transit service outside the required distances as pan or the construction process.The protect team has secured an agreement withthe transit agency to restore the rerouted service. What is the maximum number of years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to Quality Transit?

Options:

A.

One year

B.

Two years

C.

Three years

D.

Four years

Questions # 19:

A developer is considering purchasing a 400-acc (161 hectare) site which la currently zoned (or two dwelling units(DU) per sere (five DU/hectare).Which initial action during the entitlement process would help make the site eligible for LEED for NeighborhoodDevelopment certification?

Options:

A.

Create an overlay district

B.

Rezone the project for a higher density

C.

Build commercial uses around the development border

D.

Contact the Location and Planning Technical Advisory Group for initial review

Questions # 20:

What Is the maximum distance from the project’s geographic center thata community garden outside the project boundary can be located in order to satisfy the requirement for Neighborhood Pattern and Design Credit,Local Food Production?

A)

Question # 20

B)

½ mi. (0.8 km)

C)

Question # 20

D)

Question # 20

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Viewing page 2 out of 3 pages
Viewing questions 11-20 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.