Viewing questions 11-20 out of questions
Questions # 11:

A benefit of recommending LED lamps in an environmentally preferable purchasing policy is that they

Options:

A.

are rapidly renewable

B.

have no mercury content

C.

are adaptable to all existing fixtures have lower up front costs than fluorescent lamps

Questions # 12:

To fulfill the Indoor Environmental Quality Prerequisite, Green Cleaning Policy, cleaning chemicals must be handled in a manner that

Options:

A.

meets ASHRAE standards

B.

reduces transportation expenses

C.

is in accordance with ASTM-779-03

D.

limits opportunities for accidental spills and leaks

Questions # 13:

In following the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor Air Quality (IAQ) Guidelines for Occupied Buildings under Construction, what is the Minimum Efficiency Reporting Value (MERV)

as determined by ASHRAE 52.2-2007 required for renovation activities?

Options:

A.

7

B.

8

C.

12

D.

13

Questions # 14:

Which of the following statements must be true in order to achieve the Water Metering Credit?

Options:

A.

All meters must be recorded weekly and shared with USGBC over a five-year period beginning on the date the project accepts LEED certification

B.

All meters must be recorded biweekly and shared with USGBC over a three-year period begin-ning on the date the project accepts LEED certification

C.

All meters must be recorded biweekly and shared with USGBC over a five-year period begin-ning on the registration date of the LEED project

D.

All meters must be recorded weekly and shared with USGBC over a three-year period begin-ning on January 1st of the year in which the project accepts LEED certification

Questions # 15:

Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources

Credit, Solid Waste Management - Ongoing?

Options:

A.

Office chairs

B.

Mercury-containing lamps

C.

Shelving units

D.

Toner cartridges

Questions # 16:

Which of the followings operational elements need to be tracked only once during the performance period in order to meet the Sustainable Sites, Site Management Credit?

Options:

A.

Soil Testing

B.

Irrigation monitoring

C.

Fertilizer application

D.

Records of deicer use (if applicable)

Questions # 17:

A project team has ended all their performance periods between August 1st and August 31st. When is the latest date that the project team can submit for preliminary review?

Options:

A.

September 30th

B.

October 30th

C.

November 30th

D.

December 30th

Questions # 18:

A project is using an on-site captured rainwater system and municipally treated wastewater for both flush fixtures and irrigation. To which of the following Water Efficiency prerequisites or credits can these alternative water sources be applied?

Options:

A.

Both alternative water sources may only be applied towards the credits for both Indoor Water Use Reduction and Outdoor Water Use Reduction

B.

Both alternative water sources may only be applied towards the prerequisites for both Indoor Water Use Reduction and Outdoor Water Use Reduction

C.

The on-site captured rainwater may only be applied to Water Efficiency Prerequisite, Indoor Water Use Reduction while the municipally treated wastewater may only be applied to Water Efficiency Prerequisite, Outdoor Water Use Reduction

D.

The on-site captured rainwater system may only be applied to Water Efficiency Credit, Indoor Water Use Reduction, while the municipally treated wastewater may only be applied to Water Efficiency Credit, Outdoor Water Use Reduction

Questions # 19:

A project owner has hired a Commissioning Authority (CxA) to develop a Commissioning (Cx) Plan which will be

submitted in the LEED application to document Energy and Atmosphere Credit, Existing Building Commissioning -

Analysis, Option 1. Existing Building Commissioning. At a minimum, what should be included in the Cx Plan?

Options:

A.

Cx program overview, project team members, and process activities

B.

Energy Use Breakdown, project team members, and Capital Improvements Measures

C.

Low and No Cost Improvements, Energy Use Breakdown, and Capital Improvements Measures

D.

Cx process activities, Water efficiency optimization strategies, and Energy Use Breakdown

Questions # 20:

A building owner wishes to provide better Indoor Environmental Quality to the building occupants while containing capital costs. The LEED AP suggests pursuing Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Filtration. However, the existing HVAC system was not designed to accommodate the required filters but is otherwise efficient and operating well. Which strategy would enable credit achievement?

Options:

A.

Balance the existing HVAC system

B.

Increase fan capacity to maintain air delivery despite the added resistance

C.

Decrease fan capacity to maintain air delivery despite the added resistance

D.

Replace the existing HVAC system with an air handler that can accommodate the filters