Questions # 1:

What type of heat transfer is reduced by adding insulation to the inside surface of a wall?

Options:

A.

Convection

B.

Conduction

C.

Radiation

Questions # 2:

A steam trap with a 6-mm orifice in an 0.8-MPa steam system has failed open. The steam system is pressurized8.760 hours/yr. The steam cost is $15.00 /GJ. Using thetable below, what is the annualcost of the vented steam through the failed steam trap? ignore any condensate return issues.

Question # 2

[The question from the previous image, which was about calculating the annual cost of heat loss through a wall, but had a discrepancy between the calculated cost and the provided answer choices]

Options:

A.

$5,000/yr

B.

$10,000/yr

C.

$20,000/yr

D.

$30,000/yr

E.

$40,000/yr

Questions # 3:

What is the uniform series present worth factor (P/A, i%, n) for an annual interest rate of 15% and a lifetime of 20 years?

Options:

A.

0.160

B.

0.214

C.

4.676

D.

6.259

Questions # 4:

An office building is illuminated with T8 fluorescent lamps. Which of the following is the best schedule for group relamping (total replacement of all the T8 fluorescent lamps in the building)?

Options:

A.

When you reach 70% of the rated lamp life

B.

Every 4 years

C.

When 25% of the lamps have failed

D.

When 20% of the ballasts have failed

E.

When the building owner changes

Questions # 5:

How much fuel is required to heat 50 kg water from 20°C water to 200°C saturated steam? Assume the boiler is 80% efficient (based on the higher-heating value of the fuel).

Options:

A.

127.2 MJ

B.

169.3 MJ

C.

210.5 MJ

D.

511.2 MJ

Questions # 6:

Calculate the monthly electric bill for a customer that used 400 kW and 75,000 kwh during one month. Use the following declining block structure for a monthly bill:

Question # 6

SELECT THE CORRECT ANSWER

Options:

A.

$3,280

B.

$4, 580

C.

$7,850

D.

$9,660

E.

$12,500

Questions # 7:

How much energy (kJ) is required to heat 2 kg of water from 25°C to 2 kg of water at 100°C? (The specific heat of water (C) is 4.2 kJ/kg-°C. Assume no system losses.)

Options:

A.

420 kJ

B.

510 kJ

C.

630 kJ

D.

840 kJ

Questions # 8:

If the initial design process includes group relamping, how can this reduce the number of lamps required to illuminate a space?

Options:

A.

Group relamping reduces factors that contribute to light loss, which means fewer lamps are required to illuminate a space

B.

Group relamping reduces the overall amount of lamp breakages, which means fewer lamps are required to illuminate a space.

C.

Group relamping requires using larger Wattage lamps, which means fewer lamps are required to illuminate a space

D.

Group relamping improves the room cavity ratio, which means fewer lamps are required to illuminate a space

E.

Group relamping cannot reduce the number of lamps required to illuminate a space

Questions # 9:

A fully-loaded heat pump unit delivers 36-kW thermal heating with a power draw of 12-kW electric. What is the coefficient of performance (COP) at full load?

Options:

A.

2.0

B.

3.0

C.

4.0

D.

5.0

E.

6.0

Questions # 10:

At the end of a performance contract, who owns the equipment installed by the project?

Options:

A.

The bank

B.

The energy service company

C.

The equipment manufacturer

D.

The company that paid the contract payments