Questions # 31:

A cooling tower is delivering water to a chilled-water plant. The cooling tower outlet temperature has a 6°C approach temperature to the ambient air, wet-bulb temperature. The outside air conditions are 20°C dry bulb, 60% relative humidity. Using the psychrometric chart, at what temperature can the cooling tower deliver water to the chilled-water plant?

Options:

A.

13°C

B.

17°C

C.

21°C

D.

25°C

Questions # 32:

Why do electric utility companies transmit power at high voltages?

SELECT THE CORRECT ANSWER

Options:

A.

Higher voltages are more stable

B.

Higher voltages are safer

C.

Transmission power losses (12R) are less

D.

Electrical frequency is more stable

Questions # 33:

What term describes the difference between the control signal value and the set point?

Options:

A.

Differential

B.

Dead band

C.

Error or offset

D.

Cut off

E.

Dead time

Questions # 34:

A motor operates with a normal and constant load. The electric current is measured to be 25% of the motor's nameplate rating. What does this mean?

Options:

A.

The motor is operating at high efficiency

B.

The motor is oversized and may be downsized to increase efficiency

C.

The applied voltage is too low and should be increased to improve efficiency

D.

The applied voltage is too high and should be reduced to improve efficiency

Questions # 35:

Using a degree-day base of 18°C, calculate the number of cooling degree days (CDD) if the outside temperature is a uniform 25°C throughout the year (365 days/year).

Options:

A.

1,845 CDD/yr

B.

1,955 CDD/yr

C.

2,250 CDD/yr

D.

2,555 CDD/yr

E.

2,975 CDD/yr

Questions # 36:

A refrigerant-to-water heat exchanger can be added to air-conditioning equipment to heat water using the waste heat in the vapor compression refrigerant cycle. Where is this type of heat exchanger located in the refrigerant loop?

Options:

A.

After the condenser coil, before the thermal expansion valve

B.

After the expansion valve, before the evaporator coil

C.

After the evaporator coil, before the compressor

D.

After the compressor, before the condenser coil

Questions # 37:

Which electric rate tariff would best cost justify a thermal energy storage (TES) system?

Options:

A.

High electricity rate and low peak-demand rate

B.

Low electricity rate and low peak-demand rate

C.

Great differential between off-peak and on-peak time-of-use electricity rates

D.

Great differential between high season and low season electricity rates

E.

Great differential between high season and low season demand rates

Questions # 38:

An energy-saving project saves $30,000 per year. The project life is 10 years and the company minimum annual rate of return (MARR) is 15%. How much can the project cost and still be cost effective?

Options:

A.

$150,570

B.

$165,903

C.

$188,343

D.

$198,992

E.

$201,123

Questions # 39:

A 7 bar (gauge pressure) compressed air system has 5 leaks that are 3 mm in diameter and 3 leaks that are 6 mm in diameter. The compressed-air system is pressurized 8,760 hours per year. Electricity cost is $0.10/kWh. What is the annual cost of the leaks in the compressed air system?

Options:

A.

$18,150/yr

B.

$25,220/yr

C.

$30,910/yr

D.

$48,480/yr

E.

$56,500/yr