Questions # 11:

An air-conditioning unit delivers 10,000 kJ/h (thermal cooling). The equipment uses single-phase electrical power at 220-volt and 5.25 amps with a power factor of 100%. Calculate the coefficient of performance (COP).

Options:

A.

2.4

B.

3.2

C.

6.2

D.

13.2

E.

16.1

Questions # 12:

A new energy-efficient boiler costs $60,890 to buy and install. The new energy-efficient boiler will save $15,400 per year and last for 20 years. What is the internal rate of return (IRR) of the project?

Options:

A.

10%

B.

15%

C.

20%

D.

25%

E.

30%

Questions # 13:

A desk lamp is located inside a windowless office. The office is heated during the winter and cooled during the summer. When the lamp is switched on, how much of the energy consumed by the lamp becomes heat in the office space?

Options:

A.

25%

B.

80%

C.

100%

D.

120%

Questions # 14:

An outdoor parking area has 25 light poles. Each pole has a 420 Watt (ballast included) high-pressure sodium (HPS) luminaire. The parking area lights are illuminated 4,500 hours per year and the electricity cost is $0.08/kWh. What is the annual energy cost reduction if each luminaire is replaced with a 220-Watt (driver included) LED luminaire?

Options:

A.

$1,200/yr

B.

$1,500/yr

C.

$1,800/yr

D.

$2,200/yr

E.

$2,600/yr

Questions # 15:

When comparing two similar facilities, you see that the facility with newer, higher-efficiency equipment has a higher energy-use index [EUI] (kJ/m²-yr). What might be the cause?

Options:

A.

The facility with the higher EUI is in need of commissioning

B.

The facility with the lower EUI is in need of commissioning

C.

The facility with the lower EUI requires a performance contract

D.

The facility with the higher efficiency equipment should have a higher EUI

E.

The facility with the higher EUI requires a supervisory control and data acquisition (SCADA) system

Questions # 16:

For general indoor residential lighting applications, which light source can provide the most appropriate illumination with the highest efficacy?

Options:

A.

Incandescent

B.

Compact fluorescent (CFL)

C.

Mercury vapor (MV)

D.

Light-emitting diode (LED)

E.

Low-pressure sodium (LPS)

Questions # 17:

How does an enthalpy-based economizer control operate?

Options:

A.

Using a constant mixed air proportion control sequence

B.

Comparing the difference in dry-bulb air temperature measurements of the return air and the outdoor air

C.

Measuring the outdoor air dry-bulb temperature and relative humidity

D.

Using the dry-bulb temperature and relative humidity of both the outdoor-air and return-air

Questions # 18:

Electricity costs SO. 10 per kWh. if an electric water heater has an efficiency of 95*6. what is the equivalent price of natural gas per Gigajoule for a natural gas water heater? The natural gas water heater has an efficiency of 95*t based on lower-heating value.

[Natural gas has an energy content of 36.400 K|/m3 (higher-heating value) and 32-760 K/m3 (lower-heating value).]

SELECT THE CORRECT ANSWER

Options:

A.

$15/GJ

B.

$21 /GJ

C.

$25 /GJ

D.

$33 /GJ

Questions # 19:

A concentrating solar thermal system collects 5 GJ/h of thermal heat, which is delivered to a 94% efficient hot water generator. The hot water generator is used to raise the water temperature from 15°C to 65°C. The specific heat of water (Cp) is 4.2 kJ/kg-°C. What flow rate (liter/second) of hot water can be delivered from the hot water generator?

Options:

A.

4.2 liter/second

B.

6.2 liter/second

C.

9.2 liter/second

D.

12.0 liter/second

Questions # 20:

An energy-saving project costs $540,000. The project will have maintenance costs of $25,000 per year. The energy savings from the project are $160,000 per year. The project has a life of 10 years with no salvage value. The minimum attractive rate of return (MARR) is 10%. Using end-of-year cash flows, calculate the net-present value (NPV) of the project.

Options:

A.

$154,657

B.

$289,575

C.

$311,556

D.

$456,254

Viewing page 2 out of 4 pages