Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the API ICP Programs API-SIEE Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam API-SIEE Premium Access

View all detail and faqs for the API-SIEE exam


388 Students Passed

86% Average Score

93% Same Questions
Viewing page 3 out of 4 pages
Viewing questions 21-30 out of questions
Questions # 21:

In addition to maximum rated voltage, manufacturer’s name, trademark and AWG, which of the following markings is required for all conductors and cables?

Options:

A.

NEC class

B.

Country of origin

C.

Batch or lot number

D.

Wire type designator

Questions # 22:

What document is used for petroleum and chemical industry premium-efficiency, severe-duty, totally enclosed fan-cooled TEFC squirrel cage induction motors up to and including 370 kW 500 hp?

Options:

A.

API 546

B.

IEEE 141

C.

IEEE 841

D.

NFPA 70

Questions # 23:

What is the process that aims to find potential defects in a product before it is released for delivery?

Options:

A.

Inspection

B.

Examination

C.

Quality Control

D.

Quality Assurance

Questions # 24:

According to ANSI C57.12, each line terminal of a winding shall be tested to what maximum value?

Options:

A.

Switching Impulse Insulation Level

B.

Chopped Wave Insulation Level

C.

Wye-Winding Insulation Level

D.

Basic Lightning Impulse Insulation Level

Questions # 25:

According to API 541, subsequent to completion of manufacture and testing, the vendor shall revise and resubmit the previously supplied purchase data including all the following except:

Options:

A.

rotor-balance report.

B.

operating manual.

C.

as-built data sheet.

D.

shop test data.

Questions # 26:

A source inspection coordinator is determining whether an item should receive resident inspection rather than final inspection only. Which factor is MOST directly relevant?

Options:

A.

Color of enclosure paint

B.

Probability and consequence of failure

C.

Number of supplier sales offices

D.

Whether the item is stored indoors

Questions # 27:

The evaluation of a component for compliance with product specification and data sheet is known as:

Options:

A.

standardization.

B.

inspection.

C.

validation.

D.

documentation.

Questions # 28:

According to NFPA 70, is the use of Teflon tape on threaded connections for conduits allowed?

Options:

A.

Only when installed in a Class I, Division 2 area

B.

Yes, the use of Teflon on metal raceways, cable armor, and other metal enclosures prevents water from entering

C.

No, metal raceways and other metal enclosures for conductors shall be metallically joined together into a continuous electrical conductor

D.

Yes, the use of Teflon ensures an explosion proof vapor seal

Questions # 29:

Who is responsible for verifying that Non-conformance report NCR disposition has been properly implemented?

Options:

A.

Vendor's Quality Manager

B.

Inspection Coordinator

C.

Source Inspector

D.

Manufacturing Engineer

Questions # 30:

The primary purpose of the source inspection project plan is to provide the:

Options:

A.

project specific details on how the inspection activities performed will meet the expected quality.

B.

basis for the risk assessment associated with each specific piece of equipment.

C.

experience, training and certification record of each source inspector assigned to each supplier/vendor.

D.

safety and professional conduct policy for the inspector assigned to the supplier/vendor.

Viewing page 3 out of 4 pages
Viewing questions 21-30 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.