Questions # 31:

Which item is part of typical final inspection and shipping preparation for a liquid-immersed transformer?

Options:

A.

Verification that all FAT issues are resolved

B.

Reclassification of the project risk register

C.

Reissue of procurement bid tabs

D.

Elimination of all documentation requirements

Questions # 32:

Which of the following is listed as a typical transformer inspection point in the guide?

Options:

A.

Verification of PCB content labeling

B.

Rotor bar balance check

C.

Impeller alignment

D.

Ventilation fan blade pitch adjustment

Questions # 33:

Final inspection and shipping preparations of switchgear typically consists of verifying all of the following except:

Options:

A.

all final manufacturing and drawing issues are closed.

B.

correct engraving of unit and master nameplates.

C.

visual inspection of packaging requirements.

D.

all items on the manufacturer's QC checkout are signed off.