Questions # 11:

A cross-connect in the Telecommunications Room uses 110-blocks. Which parameter is MOST important to verify after performing cross-connects?

Options:

A.

Continuity and wire map for each pair

B.

That block label colors match the TIA standard

C.

The block’s brand matches the cable manufacturer

D.

A 25 mm (1 in) cable slack behind the block

Questions # 12:

A BICSI Installer 2 must verify continuity on all conductors of a multi-pair backbone copper cable. Which tool is the MOST efficient for accomplishing this?

Options:

A.

A standard VOM (Volt-Ohm Meter)

B.

Time Domain Reflectometer (TDR)

C.

A tone generator with an inductive amplifier

D.

A cable certification tester with pair continuity functionality

Questions # 13:

What is the characteristic impedance of Series-6 coaxial cable?

Options:

A.

25 ohms

B.

50 ohms

C.

75 ohms

D.

100 ohms

Questions # 14:

What is the required physical topology for a SCS?

Options:

A.

Star

B.

Bus

C.

Ring

D.

Tree

Questions # 15:

Which of the following may provide a demarcation point between the service provider and the customer premises cabling?

Options:

A.

Telecommunications room

B.

Work area

C.

Telecommunications enclosure

D.

Entrance facility

Questions # 16:

When bonding a shielded twisted-pair cable system, which of the following must be ensured to comply with proper grounding and bonding practices?

Options:

A.

Only the outer jacket is stripped back to expose the shield at the connector

B.

The cable shield is bonded to a non-conductive anchor to prevent ground loops

C.

The drain wire or shield foil is securely bonded to the connecting hardware or patch panel that is connected to the TGB/TMGB

D.

The shield is folded back outside of the connector for easy visual inspection

Questions # 17:

Which of the following is the bonding connection point for telecommunications systems and equipment in the area by a telecommunication space?

Options:

A.

SBB

B.

RBB

C.

BBC

D.

TEBC

Questions # 18:

Which of the following is a critical requirement for a Telecommunications Enclosure (TE) as opposed to a Telecommunications Room (TR)?

Options:

A.

The TE must have active electronics fully protected by a 2-hour rated firewall

B.

The TE can be secured to a wall or ceiling and is typically smaller, without dedicated HVAC

C.

The TE requires dedicated electrical power panels for distribution

D.

The TE must hold all building cross-connects for the backbone cabling

Questions # 19:

What grade of plywood is recommended for use with ICT systems?

Options:

A.

A/C

B.

A/D

C.

C/D

D.

B/C

Questions # 20:

Which of the following terms is used to describe mechanical firestop systems?

Options:

A.

Endothermic

B.

Intumescent

C.

Ablative

D.

Elastomeric

Viewing page 2 out of 5 pages