Questions # 11:

Which of the following wall solar reflectivity indexes would be the most energy efficient in a hot climate?

Options:

A.

0.2

B.

0.3

C.

0.4

D.

0.7

Questions # 12:

During an EDGE audit for a project, the Auditor discovers that members of the design team have provided misleading information on certain green building measures to the Client. This incorrect information has unknowingly been used by the Client to support their application for EDGE certification. What should the EDGE Auditor do?

Options:

A.

Call the offending design team member and negotiate a friendly solution.

B.

Contact the design team and recommend that they provide updated and correct information.

C.

Contact the Client and warn them of the deception, pointing out the design team members at fault.

D.

Reject the information and adjust the EDGE assessment accordingly, returning the assessment to the Client.

Questions # 13:

Which of the following is NOT an option for insulation in materials efficiency measures?

Options:

A.

Mineral wool

B.

Polyurethane

C.

Polypropylene

D.

Polystyrene

Questions # 14:

In EDGE software, occupancy sensors are used for controlling:

Options:

A.

Lighting.

B.

Water taps.

C.

Air conditioners.

D.

External lighting.

Questions # 15:

Which of the following BEST describes an EDGE Expert?

Options:

A.

A consultant who can issue a preliminary EDGE certificate

B.

An individual accredited by the EDGE Certifier who can serve as a consultant

C.

An individual who can serve as both an auditor and a consultant upon EDGE Committee approval

D.

An individual accredited by the EDGE Operations and Management Team who can serve as a consultant

Questions # 16:

Utility cost savings are calculated based on reduction in total:

Options:

A.

Electricity and water consumption.

B.

Generator fuel and water consumption.

C.

Building energy and water consumption.

D.

Energy and water consumption from the supply grid.

Questions # 17:

Which of the following building types is NOT covered by EDGE?

Options:

A.

Hospitals

B.

Schools

C.

Factories (heavy industry)

D.

Warehouses

Questions # 18:

In the EDGE software, what is the unit of the embodied carbon of the material?

Options:

A.

kgCO2

B.

MJ

C.

BTU

D.

kWh

Questions # 19:

What will reduce the hot water demand in a hotel building?

Options:

A.

Solar photovoltaics (PVs)

B.

Solar water heating

C.

Low-flow shower heads

D.

Heat pumps for hot water

Questions # 20:

Which of the following measures will impact energy, water, and materials in an air-conditioned hospital with a water-cooled chiller?

Options:

A.

Insulation of the roof

B.

Water-efficient urinals

C.

Variable speed drive pumps

D.

Water-efficient dishwashers