Questions # 31:

In order for a project to complete the design certification stage requirements, the EDGE Client must do which of the following?

Options:

A.

Internally review the EDGE measures with their design team and third-party consultant.

B.

Access the EDGE software and begin and complete a full self-assessment of the building.

C.

Provide the EDGE Auditor access to the self-assessment and all supporting documentation.

D.

Review and sign an agreement with a local or global partner to provide EDGE certification services.

Questions # 32:

An EDGE Auditor is auditing a hospital design for Preliminary Certification. The EDGE Client has included photovoltaics as one of the energy measures resulting in an overall 21% saving in energy. The Auditor observes the photovoltaics are facing the wrong direction. What action should the Auditor take?

Options:

A.

Contact the design team directly and suggest a better orientation for the photovoltaics.

B.

Adjust the area of photovoltaic panels in the assessment to allow for reduction in energy output.

C.

Assess the energy measures as they are presented to you, without changing the photovoltaic selection.

D.

Reject photovoltaics from the selected set of energy measures and notify the Client regarding the orientation.

Questions # 33:

Within the EDGE methodology, recycled water or rainwater harvested on site is deducted from the building’s Improved Case water consumption and is reported as:

Options:

A.

Water usage

B.

Water savings

C.

Wastewater

D.

Potable water

Questions # 34:

In the EDGE software, the Base Case selection of external wall materials in hotels relies on information derived from:

Options:

A.

Typical building practices as well as national building performance codes, where they are in existence.

B.

Global building practices as well as international building performance codes, where they are in existence.

C.

Hotel developers' corporate standard specifications, or materials which have been accredited by the hotel industry.

D.

Local building material suppliers who subscribe to EDGE certification for their materials, or are nationally accredited by the local standards authority.

Questions # 35:

For which of the following is EDGE Advanced certification available?

Options:

A.

New constructions

B.

Green lease agreements

C.

Infrastructure constructions

D.

Parks and landscape projects

Questions # 36:

In an air conditioned building with air cooled chiller, selecting insulation in the roof will influence

Options:

A.

only energy.

B.

energy and water.

C.

water and materials embodied energy.

D.

energy and materials embodied energy.

Questions # 37:

In the EDGE certification system, who is responsible for the entire project including providing project documentation, access to the site, and the payment of audit and certification fees?

Options:

A.

EDGE Expert

B.

EDGE Auditor

C.

Project Owner

D.

EDGE Certification Provider

Questions # 38:

An EDGE Auditor has received initial documentation from a Client which implies that measures not selected on the downloaded PDF can be claimed. What should the Auditor do?

Options:

A.

The Auditor should ask for advice from the EDGE Partner and then take action.

B.

The Auditor should modify the self-assessment and submit the project for certification.

C.

Inform the Client to update the EDGE software and prepare a new PDF.

D.

As submission documents are correct, the Auditor should ignore the error on PDF.

Questions # 39:

The Client informs an EDGE Auditor that a key member of the design team has resigned. The Client requests the Auditor to take the member’s place for the remainder of the project’s design development as it would provide the Auditor an opportunity to identify suitable green building measures, making audit tasks much simpler. What should the EDGE Auditor do?

Options:

A.

Resign from the audit role on the basis that its position has been compromised by this direct approach by the Client.

B.

Refer the Client to an associate within the organization who works in another department, but is qualified and available to carry out the work.

C.

Accept the additional commission on the basis that this will save the Client time and money, and would reduce the volume of work required for the audit.

D.

Refer the Client to an associate within the organization who will be working with the Auditor on the EDGE audit, since the Auditor organization has spare capacity.

Questions # 40:

A Client is developing two identical hotels in different cities but finds that the energy intensity (kWh/m²/year) of the hotels are different. Which of the following difference in these two cities could have caused this?

Options:

A.

Climate

B.

Electricity prices

C.

Cost of materials

D.

Availability of fresh water

Viewing page 4 out of 4 pages
Viewing questions 31-40 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.