Questions # 21:

Which type of evidence is required at the post-construction stage for the efficiency measure window glazing?

Options:

A.

Design building elevations marking the window glass specifications

B.

Bill of quantities with the specifications for the window glass highlighted

C.

Manufacturer's data sheets showing the make and model, U-value, and SHGC of the installed glass

D.

Window schedule for the building showing the major window glass types if more than one type of glass is present

Questions # 22:

Energy consumption calculations in EDGE are based on:

Options:

A.

Hourly simulation.

B.

Steady state calculations.

C.

Quasi-steady state calculations.

D.

Cooling and heating degree days.

Questions # 23:

Which statement is correct about a “required” measure?

Options:

A.

The measure must be assessed.

B.

The measure must be implemented in the project.

C.

The measure can only be implemented in the project after an approval by a Special Ruling Request SRR.

D.

The actual performance must meet or exceed the baseline case to comply with EDGE requirements.

Questions # 24:

Increasing the glazing area of an office building will NOT impact which of the following?

Options:

A.

Cooling demand

B.

Heating demand

C.

Lighting energy

D.

Hot water demand

Questions # 25:

Which of the following protocols should be followed when the project city is not listed in the EDGE App?

Options:

A.

Write to EDGE Certifier to request the city to be included and wait for the application to be updated.

B.

Choose the closest city to the project location and edit the climate data if necessary.

C.

Select any city in the same climate zone around the world and use that to certify the project.

D.

Choose the capital city to the project location and edit the climate data if necessary.

Questions # 26:

In the EDGE software, which of the following does NOT produce grey water?

Options:

A.

Shower

B.

Hand wash basin

C.

Bath tub

D.

Water closet WC

Questions # 27:

How often should the EDGE Zero Carbon certification be renewed?

Options:

A.

Initially after two years, subsequently every four years

B.

Initially after four years, subsequently every two years

C.

Every two years if using carbon offsets, or every four years if using 100% renewable energy

D.

Every four years if using carbon offsets, or every two years if using 100% renewable energy

Questions # 28:

Which of the following must be included in the EDGE Auditor submission for Preliminary Certification?

Options:

A.

All of the available design data.

B.

The Chapter 5 EDGE certification protocol.

C.

Compliance documents for selected measures.

D.

The design audit site visit results verified by the EDGE Auditor.

Questions # 29:

Which of the following building types is NOT covered by EDGE?

Options:

A.

Hospitals

B.

Schools

C.

Factories (heavy industry)

D.

Warehouses

Questions # 30:

For a project in a hot and dry climate with no air-conditioning system, which of the following will NOT have an impact on the occupants' thermal comfort?

Options:

A.

Ceiling fans

B.

Solar shading

C.

Wall and roof insulation

D.

Solar photovoltaics

Viewing page 3 out of 4 pages
Viewing questions 21-30 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.