Spring Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror
Pass the Exin EPI Data Centre CDCS Questions and answers with ExamsMirror
Exam CDCS Premium Access
View all detail and faqs for the CDCS exam
701 Students Passed
85% Average Score
94% Same Questions
You need to determine the strategy for the cooling audit. All the servers are based on a front-to-rear (F-R) airflow design.
Which location for the temperature/humidity measurement should you recommend for the audit?
What should be considered when installing overhead data cabling?
What should you consider when using raised floor tiles with air deflectors or louvers?
You are installing new copper cabling.
What is the advantage or disadvantage of choosing pre-terminated category 6 or 6A cabling?
What is a potential disadvantage of using a hypoxic-based fire suppression system as a fire extinguishing system?
In order to save energy, you are going to install an automated system to switch off lights. What should be taken into consideration when installing such a system?
What is a potential disadvantage of using water mist as a fire extinguishing system?
Smoke sensors need to be tested to ensure that they pick up a potential fire in the data center.
What should you recommend?
A data center is in an area where utility power is highly available—only a few outages per year, typically <1 hour per event and <50 hours/year not available. What type of generators should be installed?
Do all residual current devices (RCDs) use the same operating principle?
TOP CODES
Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.