Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the GAQM Lean Six Sigma Black Belt Certification CLSSBB Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam CLSSBB Premium Access

View all detail and faqs for the CLSSBB exam


727 Students Passed

97% Average Score

91% Same Questions
Viewing page 5 out of 11 pages
Viewing questions 41-50 out of questions
Questions # 41:

A pharmaceutical manufacturer is designing an experiment to test four different capsule ingredients designed to reduce dissolution time. Each ingredient will be tested at 10 milligrams and 40 milligrams. A full factorial design is used with five replications per run. The number of levels, factors and runs is, respectively:

Options:

A.

2, 4, 16

B.

4, 5, 8

C.

10, 4, 40

D.

2, 20, 16

Questions # 42:

A higher resolution number for an experimental design indicates that:

Options:

A.

results are more clear

B.

confounding between main effects and interaction effects are less likely to be significant

C.

a higher number of replications have been used

D.

all factors have been tested at all levels

E.

the design is more balanced

Questions # 43:

The following data were collected on the diameters of turned shafts: 2.506 2.508 2.505 2.505. These values are:

I. Attribute data

II. Discrete data

III. Variables data

IV. Continuous data

Options:

A.

I and II A stable, normally distributed process with specification 3.50 .03 has = = .016. What percent of the production violates specification?

B.

I only

C.

II only

D.

I and IV

E.

III and IV

Questions # 44:

A project activity not on the critical path has required 20% longer than the time originally allocated. The project team should:

Options:

A.

inform all concerned that the entire project will be delayed by 20%

B.

inform all concerned that the entire project will be delayed but by less than 20%

C.

study the effect this will have on other activities because the project may still be on schedule

Questions # 45:

There are 14 different defects that can occur on a completed time card. The payroll department collects 328 cards and finds a total of 87 defects. DPMO =:

Options:

A.

87 ÷ 328

B.

87 ÷ (328 × 14)

C.

14 ÷ 87

D.

87 ÷ 14 × 1,000,000

E.

328 ÷ 87

F.

87 × 1,000,000 ÷ (14 × 328)

Questions # 46:

The Central Limit Theorem states that the distribution of sample means approximates a normal distribution if:

Options:

A.

the population is normally distributed

B.

the sample is normally distributed

C.

the sample is randomly selected

D.

the sample size is sufficiently large

E.

the means are carefully calculated

Questions # 47:

Intuitively, which factor A or B seems most likely to be significant?

Question # 47

Options:

A.

A

B.

B

C.

C

D.

neither

E.

both about equally significant

Questions # 48:

A machine tool vender wants to sell an injection molding machine. The current machine produces 3.2% defectives. A sample of 1100 from the vender’s machine has 2.9% defective. Do these numbers indicate that the proposed machine has a lower rate of defectives?

Options:

A.

yes

B.

no

Questions # 49:

When comparing two vendors’ machines it is found that a sample of 1000 parts from machine A has 23 defectives and a sample of 1300 parts from machine B has 36 defectives. Do the data indicate that machine B has a higher rate of defectives?

Options:

A.

yes

B.

no

C.

all of the above

Questions # 50:

Find the value of (4) in the ANOVA table. Assume:

Question # 50

Options:

A.

16.4

B.

3.2

C.

18.6

D.

23.2

E.

4.54

F.

12.2

G.

0.525

Viewing page 5 out of 11 pages
Viewing questions 41-50 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.