For a line in an FMEA form a team has established the following:
Cost: $82
Severity: 7
Occurrence: 9
Detection: 4
Target date: 7 days
What should the risk priority number (RPN) be for this line:
Which of the following is a component of a visual factory?
An x-bar and R chart is used to monitor a process. One week ago a new type of raw material was introduced and since that time 60 points have been plotted on the xbar chart and all are in the middle third of the chart. The corresponding 60 points on the R chart are all below the average range. This indicates that:
A tree diagram can be used to do which of the following?
Which of the following tools is used to identify potential events and contingencies for an implementation plan?
Poka-yoke is best defined as
A Black Belt is going to monitor the number of defects on different size samples. Which of the following control charts would be most appropriate?
Which of the following best describes a controlled variable whose influence on a response is being studied?
An advantage of using standard deviation rather than range for measuring dispersion of a large sample is that:
Nominal Group Technique is used to: