Statistical Difference is the magnitude of difference or change required to distinguish between a true difference, brought about by change or improvement, and one that could have occurred by chance.
An operator checks that all boxes being packed contain enough products to fill the box. However, each box getting filled has a different number of products in it. This is a Reproducibility problem, not a Repeatability problem.
Cost of Poor Quality (COPQ) can be classified as Visible Costs and Hidden Costs. Which of these items is a Visible Cost?
The reported Cpk for a process with an average of 98 units, a spread of 16 units and upper and lower specification limits of 115 and 90 units would be?
Which Experimental Design typically is most associated with the fewest number of input variables or factors in the design?
Which of these items are not part of what is necessary for successful Kaizens?
Accuracy can be assessed in several ways and a fairly accurate means of measurement is visual comparison.
If a Six Sigma project was to reduce changeover times and the team found the project success was decreasing over time since changeover times began to creep back up, which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?
The method of Steepest Ascent guides you toward a target inside the original inference space.
When we compare short-term and long-term Capability which of these is true?