Questions # 51:

Statistical Difference is the magnitude of difference or change required to distinguish between a true difference, brought about by change or improvement, and one that could have occurred by chance.

Options:

A.

True

B.

False

Questions # 52:

An operator checks that all boxes being packed contain enough products to fill the box. However, each box getting filled has a different number of products in it. This is a Reproducibility problem, not a Repeatability problem.

Options:

A.

True

B.

False

Questions # 53:

Cost of Poor Quality (COPQ) can be classified as Visible Costs and Hidden Costs. Which of these items is a Visible Cost?

Options:

A.

Lost Customer Loyalty

B.

Time Value of Money

C.

Returns

D.

Late Delivery

Questions # 54:

The reported Cpk for a process with an average of 98 units, a spread of 16 units and upper and lower specification limits of 115 and 90 units would be?

Options:

A.

0.5

B.

0.75

C.

1.00

D.

1.25

Questions # 55:

Which Experimental Design typically is most associated with the fewest number of input variables or factors in the design?

Options:

A.

Fractional Factorial design

B.

Full Factorial design

C.

Simple Linear Regression

D.

Response Surface Design

Questions # 56:

Which of these items are not part of what is necessary for successful Kaizens?

Options:

A.

Good lighting

B.

Management support

C.

Operator support

D.

Analysis tools

Questions # 57:

Accuracy can be assessed in several ways and a fairly accurate means of measurement is visual comparison.

Options:

A.

True

B.

False

Questions # 58:

If a Six Sigma project was to reduce changeover times and the team found the project success was decreasing over time since changeover times began to creep back up, which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?

Options:

A.

Improve the lighting to assure adequate visibility

B.

Confirm a Visual Factory exists to assure proper communication of status of machines

C.

Implement Kanbans to assure enough inventory for the process step

D.

Reword the standardized work instructions to use active verbs and not passive phrases

Questions # 59:

The method of Steepest Ascent guides you toward a target inside the original inference space.

Options:

A.

True

B.

False

Questions # 60:

When we compare short-term and long-term Capability which of these is true?

Options:

A.

Cp is better for the short term

B.

Both short-term and long-term performance are alike

C.

Performance tends to improve over time

D.

Cp is better for the long-term