Questions # 81:

Which of these elements are not included in Implementation plans?

Options:

A.

Work breakdown structure

B.

Risk management plans

C.

Cost/Benefit ratios

D.

Planned audits of work completion

Questions # 82:

If in an experiment all possible variable pairs sum to zero the design is Orthogonal.

Options:

A.

True

B.

False

Questions # 83:

Relative to a Design of Experiments the term ________________ refers to variables being a linear combination of each other.

Options:

A.

Mirror Image

B.

Directly Parallel

C.

Collinear

D.

None of the above

Questions # 84:

Six Sigma is a business improvement discipline whose fundamental view is based on a _________ oriented approach of the business.

Options:

A.

Profit

B.

Performance

C.

Process

D.

Predatory

Questions # 85:

Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause variation the Control Charts use which of these?

Options:

A.

Data shift analysis

B.

Outlier analysis methods

C.

Center Line and Control Limits

D.

None of the above

Questions # 86:

An operator is measuring the distance between two points. Which is most likely to be influenced by the operator?

Options:

A.

Precision of the measurement

B.

Accuracy of the measurement

C.

Calibration of the instrument

D.

All of these answers are correct

Questions # 87:

As a means of measuring the effects on other areas of a process as a result of changes in the primary metric we also define and track ________________.

Options:

A.

Parallel process metrics

B.

Secondary metrics

C.

Tertiary metrics

D.

Industry standards

Questions # 88:

One of the foundations of Lean Six Sigma is the concept that the output of a process (Y) is influenced by the process inputs (X’s) and is commonly shown as which formula?

Options:

A.

Y = Z(X2)

B.

Y = f(X3)

C.

Y = f(Xn)

D.

Y = g(X+ 1.5)

Questions # 89:

A Belt working in a supply chain environment has to make a decision to change suppliers of critical raw materials for a new product upgrade. The purchasing manager is depending on the Belt’s effort requiring that the average cost of an internal critical raw material component be less than or equal to $3,600 in order to stay within budget. Using a sample of 42 first article components, a Mean of the new product upgrade price of $3,200 and a Standard Deviation of $180 was estimated. Based on the data provided, the Z value for the data assuming a Normal Distribution is?

Options:

A.

1.11

B.

2.22

C.

4.30

D.

5.42

Questions # 90:

A Lean Six Sigma project is attempting to reduce inventory days. The Process Capability will be monitored as part of the Control Phase to track the sustainability of the improvement.

Question # 90

Which distribution type is best used for performing the Capability Analysis?

Options:

A.

Weibull Distribution

B.

Normal Distribution

C.

Exponential Distribution

D.

Logistic Distribution

E.

Gaussian Distribution