Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the ISTQB Foundation Level ISTQB-CTFL Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam ISTQB-CTFL Premium Access

View all detail and faqs for the ISTQB-CTFL exam


788 Students Passed

91% Average Score

95% Same Questions
Viewing page 11 out of 13 pages
Viewing questions 101-110 out of questions
Questions # 101:

Which of the following statements about independent testing is WRONG?

Options:

A.

Independent testing is necessary because developers don't know any testing.

B.

Independent testing is best suited for the system test level.

C.

A certain degree of independence makes the tester more effective at finding defects.

D.

Independent test teams may find other types of detects than developers who are familiar with the system's structure.

Questions # 102:

During which main group of test activity are the following tasks performed?

•Checking test results and logs against specified coverage criteria.

•Assessing the level of component or system quality based on test results and logs.

•Determining whether more tests are needed.

Select the correct answer:

Options:

A.

Test planning.

B.

Test analysis.

C.

Test design.

D.

Test monitoring and control.

Questions # 103:

Which of the following statements about testing in the context of an agile (iterative-incremental) development model is correct?

Options:

A.

Unit test and acceptance test ate the most important tests to make sure that the system works as expected.

B.

Each iteration of testing has to be completely finished before a new Iteration of development starts.

C.

Regression testing is necessary whenever a new Increment Is added to the existing system. D. Only certain types of non-functional and explorative testing are performed.

Questions # 104:

A Test Manager conducts risk assessment for a project. One of the identified risks is: The sub-contractor may fail to meet his commitment". If this risk materializes. it will lead to delay in completion of testing required for the current cycle.

Which of the following sentences correctly describes the risk?

Options:

A.

It is a product risk since any risk associated with development timeline is a product risk.

B.

It is no longer a risk for the Test Manager since an independent party (the sub-contractor) is now managing it

C.

It is a object risk since successful completion of the object depends on successful and timely completion of the tests

D.

It is a product risk since default on part of the sub-contractor may lead to delay in release of the product

Questions # 105:

Which ONE of the following statements about acceptance testing is NOT correct?

Options:

A.

Testing of disaster recovery and backup/restore is usually NOT part of acceptance testing.

B.

The customers or system users are often responsible for the acceptance testing.

C.

The main goal of acceptance testing is to build confidence in the system, not find defects.

D.

Acceptance testing is the last level of testing performed prior to system release.

Questions # 106:

Which of the following is an example of black-box dynamic testing?

Options:

A.

Functional Testing

B.

Code inspection

C.

Checking memory leaks for a program by executing it

D.

Coverage analysis

Questions # 107:

Which of the following is an example of the absence-of-errors fallacy?

Options:

A.

Repeating the same test cases will continue to find new defects, even after dozens of executions

B.

A small number of modules contains the most defects

C.

Since testing found very few defects, the system certainly will be successful

D.

Other than trivial cases, it is not feasible to test all combinations of inputs and preconditions

Questions # 108:

Which of the following characterizations applies to a test tool used for the analysis of a developer's code prior to its execution?

Options:

A.

Tool support for test design and implementation.

B.

Tool support for static testing.

C.

Tool support for test execution and logging.

D.

Tool support for performance measurement and dynamic analysis.

Questions # 109:

The following rules determine the annual bonus to be paid to a salesman of a company based on the total annual amount of the sales made (referred to as TAS).

If the TAS is between 50k€ and 80k€, the bonus is 10%. If the TAS exceeds 80k€ by a value not greater than 40k€, the bonus is 15%. Finally, if the TAS

exceeds the maximum threshold which entitles to a 15% bonus, the bonus is 22%.

Consider applying equivalence partitioning to the TAS (Note: 1k€ = 1000 euros).

Which one of the following answers contain only test cases that belong to the same equivalence partition?

Options:

A.

TC1 = 81 k€; TC2= 97k€; TC3=111k€; TC4=118k€

B.

TC1 = 40k€; TC2= 46k€; TC3=51k€; TC4=53k€

C.

TC1 = 79k€; TC2= 80k€; TC3=81k€; TC4=82k€

D.

TC1 = 90k€; TC2= 110k€; TC3=125k€: TC4=140k€

Questions # 110:

Which of the following statements about decision tables are TRUE?

I. Generally, decision tables are generated for low risk test items.

II. Test cases derived from decision tables can be used for component tests.

III. Several test cases can be selected for each column of the decision table.

IV. The conditions in the decision table represent negative tests generally.

Options:

A.

I. Ill

B.

I, IV

C.

II. IV

D.

II. Ill

Viewing page 11 out of 13 pages
Viewing questions 101-110 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.