Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the ISTQB Foundation Level ISTQB-CTFL Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam ISTQB-CTFL Premium Access

View all detail and faqs for the ISTQB-CTFL exam


788 Students Passed

91% Average Score

95% Same Questions
Viewing page 6 out of 13 pages
Viewing questions 51-60 out of questions
Questions # 51:

Which of the following is a task the Author is responsible for, as part of a typical formal review?

Options:

A.

Determining the people who will be involved in the review

B.

Recording the anomalies found during the review meeting

C.

Identifying potential anomalies in the work product under review

D.

Fixing the anomalies found in the work product under review

Questions # 52:

Which of the following is the most important task of a typical test leader?

Options:

A.

To automate tests.

B.

To prepare and acquire test data.

C.

To set up the test environment.

D.

To coordinate the test strategy with project managers.

Questions # 53:

Consider a review for a high-level architectural document written by a software architect. The architect does most of the review preparation work, including distributing the document to reviewers before the review meeting. However, reviewers are not required to analyze the document in advance, and during the review meeting the software architect explains the document step by step. The only goal of this review is to establish a common understanding of the software architecture that will be used in a software development project.

Which of the following review types does this review refer to?

Options:

A.

Inspection

B.

Audit

C.

Walkthrough

D.

Informal review

Questions # 54:

You are testing a room upgrade system for a hotel. The system accepts three differed types of room (increasing order of luxury): Platinum. Silver and Gold Luxury. ONLY a Preferred Guest Card holder s eligible for an upgrade.

Below you can find the decision table defining the upgrade eligibility:

What is the expected result for each of the following test cases?

Customer A: Preference Guest Card holder, holding a Silver room

Customer B: Non Preferred Guest Card holder, holding a Platinum room

Options:

A.

Customer A; doesn't offer any upgrade; Customer B: offers upgrade to Gold luxury room

B.

Customer A: doesn't offer any upgrade; Customer B: doesn't offer any upgrade.

C.

Customer A: offers upgrade to Gold Luxury room; Customer B: doesn't offer any upgrade

D.

Customer A: offers upgrade to Silver room; Customer B: offers upgrade to Silver room.

Questions # 55:

Which type of software development product can undergo static testing?

Options:

A.

Any software development product can undergo static testing, including requirements specifications, design specifications and code.

B.

Static tests should be performed on the installation and user guide documents as these documents are used by the end user.

C.

Static testing is done only on the code as part of the "code review" sessions Other documents are reviewed, but not by static testing.

D.

Static testing is done only on the requirements You need to execute the software in order to find defects in the code.

Questions # 56:

A software system checks age in order to determine which welcome screen to display. Age groups are:

Group I: 0-12

Group II; 13-18

Group III: over 18

Which of the below represent boundary values?

Options:

A.

(-1.0.12.13.18,19)

B.

(-1.0,11.12.13,14,18.19)

C.

(0.12.13.18.19)

D.

(4.5.15.20)

Questions # 57:

Test automation allows you to:

Options:

A.

demonstrate the absence of defects

B.

produce tests that are less subject to human errors

C.

avoid performing exploratory testing

D.

increase test process efficiency by facilitating management of defects

Questions # 58:

You are responsible for applying the correct technique for a review of the requirements document for a project to develop a new software application. You identify the reviewers and the required roles, including the meeting leader, who is the requirements document author, and a separate role for a scribe. Additionally, you decide to take a relatively informal approach to the requirements review. The goal of the review is to find defects in the requirements document, such as omissions, Inconsistencies, and duplications. Another goal of the review is to improve the software application's usability and accessibility by considering the various stakeholders' viewpoints.

Which of the following statements BEST describes this scenario?

Options:

A.

This scenario is using a pair review type and a perspective-based review technique

B.

This scenario is using a walkthrough review type and a checklist-based review technique

C.

This scenario is using a walkthrough review type and a perspective-based review technique

D.

This scenario is using a pair review type and a checklist-based review technique

Questions # 59:

Which of the following statements about how different types of test tools support testers is true?

Options:

A.

The support offered by a test data preparation tool is often leveraged by testers to run automated regression test suites

B.

The support offered by a performance testing tool is often leveraged by testers to run load tests

C.

The support offered by a bug prediction tool is often used by testers to track the bugs they found

D.

The support offered by a continuous integration tool is often leveraged by testers to automatically generate test cases from a model

Questions # 60:

Which of the following activities does NOT belong to a typical technical review?

Options:

A.

Pre-meeting preparation by reviewers

B.

Using checklists during the meeting

C.

Inviting end-users to the meeting

D.

Preparation of a review report

Viewing page 6 out of 13 pages
Viewing questions 51-60 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.