Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the ISTQB Foundation Level ISTQB-CTFL Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam ISTQB-CTFL Premium Access

View all detail and faqs for the ISTQB-CTFL exam


788 Students Passed

91% Average Score

95% Same Questions
Viewing page 3 out of 13 pages
Viewing questions 21-30 out of questions
Questions # 21:

Which of the following statements BEST describes how test cases are derived from a use case?

Options:

A.

Test cases are derived based on non-functional requirements such as usability

B.

Test cases are created using white-box test techniques to execute scenarios of use cases

C.

Test cases are derived based on pair testing between a user and a tester to find defects

D.

Test cases are designed to cover various user behaviors, including basic, exceptional or alternative and error behaviors associated with human users or systems

Questions # 22:

Which of the following is a factor that contributes to a successful review?

Options:

A.

All participants in the review are aware they will be evaluated based on the defects they will find

B.

The author of the work product to be reviewed leads the review meeting.

C.

All participants in the review are trained to deal with the review type and its objectives.

D.

Review metrics must be collected to improve the review process

Questions # 23:

The following incident report that was generated during test of a web application.

What would you suggest asthe most importantreport improvement?

Defect detected date: 15 8.2010

Defect detected by: Joe Smith

Test level System test

Test case: Area 5/TC 98

Build version: 2011-16.2

Defect description After having filled out all required fields in screen 1, t click ENTER to continue to screen2Nothing happens, no system response at all.

Options:

A.

Add information about which web browser was used

B.

Add information about which developer should fix the bug

C.

Add the time stamp when the incident happened

D.

Add an impact analysis

Questions # 24:

Which of the following statements about retrospectives is TRUE?

Options:

A.

Only developers and testers should be involved in retrospectives, as involving people in other roles is very likely to prevent developers and testers from having open and constructive discussions that really help identify process improvements.

B.

Retrospectives can be very effective in identifying process improvements and can also be very efficient and cost-effective especially since, unlike reviews, they do not require any follow-up activities

C.

On Agile projects, well-conducted retrospectives at the end of each iteration can help the team reduce and sometimes even eliminate the need for dairy stand-up meetings.

D.

During retrospectives, in addition to identifying relevant process improvements, participants should also consider how to implement these improvements and retain them based on the context of the project, such as the software development lifecycle.

Questions # 25:

A software module to be used in a mission critical application incorporates an algorithm for secure transmission of data.

Which review type is most appropriate to ensure high quality and technical correctness of the algorithm?

Options:

A.

Walkthrough

B.

Informal Review

C.

Technical Review

D.

Management Review

Questions # 26:

Consider the following testing levels:

1) Component Testing

2) Integration Testing

3) System Testing

4) Acceptance Testing

Which of the following statements is true?

Options:

A.

Integration and system testing are applicable when V-model is used.

Component and acceptance testing are applicable when iterative development models are used.

B.

All the testing levels are applicable to V-model for software development.

Only acceptance testing is applicable for iterative models.

C.

Acceptance testing is applicable for all software development models.

Component and system testing are applicable only for the V-model.

D.

All testing levels are applicable, independent of which software development life-cycle process (V-model. iterative, incremental) is used.

Questions # 27:

Which ONE of the following elements is TYPICALLY part of atest plan?

Options:

A.

The budget and schedule for the test project.

B.

A detailed analysis of the defects found and their causes.

C.

A detailed report on the test results after the test project is completed.

D.

A list of test logs from the test execution.

Questions # 28:

You are testing an e-commerce system that sporadically fails to properly manage customers' shopping carts. You have stressed the urgency of this situation to the development manager and development team and they recognize the priority of resolving the underlying defect. The development team is waiting for more information, which you will include in your defect report. Given the following items of information they are included in a typical defect report:

1. The expected results

2. The actual results

3. The urgency and priority to fix this

4. The date and author of the defect report

5. A description of the defect in order to reproduce, including screenshots and database dumps

Which of these items will be MOST useful to the developers to help them identify and remove the defect causing this failure?

Options:

A.

1, 2, 5

B.

1, 2, 3, 4, 5

C.

1, 2, 4

D.

3, 4

Questions # 29:

Which ONE of the following options explains a benefit of independent testing the BEST?

Options:

A.

The testers can be isolated from the development team and thus avoid acquiring the same bias as the developers.

B.

Independent testers may lack information regarding the test object.

C.

Independent testers are likely to recognize different types of failures compared to developers.

D.

Developers may lose a sense of responsibility for the quality of the product they develop.

Questions # 30:

A calculator software is used to calculate the result for 5+6.

The user noticed that the result given is 6.

This is an example of;

Options:

A.

Mistake

B.

Fault

C.

Error

D.

Failure

Viewing page 3 out of 13 pages
Viewing questions 21-30 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.