Questions # 81:

Which TWO of the following are benefits of continuous integration?

I. Allows earlier detection and easier root cause analysis of integration problems and conflicting changes.

II. Removes the need for manual test analysis, design and execution.

Hi. Removes the dependency on automated regression packs when integrating larger systems, or components.

iv. Gives the development team regular feedback on whether the code is working.

Select the correct answer:

Options:

A.

i and iv

B.

i and ii

C.

i and iii

D.

iii and iv

Questions # 82:

Which of the following project scenario gives the BEST example where maintenance testing should be triggered?

Options:

A.

Completion of architecture of the bank system

B.

Release of the early draft of the low level project design of an loT application

C.

Defect was found in a pre-released version of the customer service application

D.

Delivery of the hot fix to mobile operating system and ensuring that it still works

Questions # 83:

The four test levels used in ISTQB syllabus are:

1. Component (unit) testing

2. Integration testing

3. System testing

4. Acceptance testing

An organization wants to do away with integration testing but otherwise follow V-model. Which of the following statements is correct?

Options:

A.

It is allowed as organizations can decide on men test levels to do depending on the context of the system under test

B.

It is allowed because integration testing is not an important test level arc! can be dispensed with.

C.

It is not allowed because integration testing is a very important test level and ignoring i: means definite poor product quality

D.

It is not allowed as organizations can't change the test levels as these are chosen on the basis of the SDLC (software development life cycle) model

Questions # 84:

Which ONE of the following is a GOOD testing practice that is INDEPENDENT of the chosen SDLC (Software Development Life Cycle) model?

Options:

A.

Testers are involved in reviewing work products as soon as the final version of this documentation is available so that this earlier testing and defect detection can support the “shift-left" strategy.

B.

Test analysis and design for a specific test level begin during the corresponding development phase of the SDLC, allowing testing to follow the principle of late testing.

C.

For every software development activity, there is a corresponding testing activity, ensuring that all development activities are subject to quality assurance.

D.

Different test levels have specific and overlapping test objectives, allowing tests to be appropriate to specific test object types while managing redundancy.

Questions # 85:

Consider the following examples of risks identified in different software development projects

[1]. It may not be possible to generate the expected workloads to run performance tests, due to the poor hardware equipment of the machines (load injectors) that should generate these workloads.

[ii]. A user's session on a web application is not invalidated after a certain period of inactivity (configured by the system administrator) of the user,

[iii]. The test team will not have an adequate requirements specification (since many requirements will still be missing) by the time test design and analysis activities should begin according to the test plan.

[IV]. Following a failure, the system is unable to continue to maintain its pre-failure operation and some data becomes corrupted.

Which of the following statements is TRUE?

Options:

A.

[ii] and [IV] are product risks; [i] and [iii] are project risks

B.

[ii]and [iii] are product risks. [I] and [IV] are project risks.

C.

[i], and [iV] are product risks; [ii] and [iii] are project risks

D.

[i], [II] and [iii] are product risks, [IV] is a project risk.

Questions # 86:

Given the following review process main activities and specific review activities:

a.Planning

b.Initiate review

c.Issue communication and analysis

d.Fixing and reporting

1.Creating defect reports

2.Estimating effort and timeframe

3.Recording updated status of defects

4.Selecting the people to participate

5.Distributing the work product and other material

6.Evaluating the review findings

Which of the following BEST matches the review process main activities with the appropriate specific review activities?

Options:

A.

2-a, 4-a, 5-b, 6-c, 1-d, 3-d

B.

2-a, 5-a, 1-b, 4-b, 3-c, 6-d

C.

1-a, 4-b, 5-b, 6-c, 2-d, 3-d

D.

2-a, 4-b, 5-c, 1-d. 3-d, 6-d

Questions # 87:

A test engineer finds a defect while testing. After the developer has fixed the defect, the test engineer decides to re-run a complete section of the tests. Which of the following is correct?

Options:

A.

The lest engineer should not re-run the tests, as they have already been run, and results recorded.

B.

The test engineer should not re-run the tests, they should be part of the developer tests.

C.

The test engineer should re-run the tests, in order to ensure that new defects have not been introduced by the fix.

D.

The test engineer should re-run the tests, because the defect shows that the test cases need to be updated.

Questions # 88:

Which of the following statements about static testing and dynamic testing is true?

Options:

A.

Unlike dynamic testing, which can be also performed manually, static testing cannot be performed without specialized tools

B.

Static testing is usually much less cost-effective than dynamic testing

C.

Unlike dynamic testing, which focuses on detecting potential defects, static testing focuses on detecting failures which may be due to actual defects

D.

Both static testing and dynamic testing can be used to highlight issues associated with non-functional characteristics

Questions # 89:

Consider the followinguser storyand itsacceptance criteria:

User Story:

As a member of the"Agnotoly"association, I want to be able topay the association’s dues through an automatic payment methodso that I can forget about payment deadlines.

Acceptance Criteria:

    The member can only pay with‘Agnesis Master’ credit card.

    The member must register theircell phone number.

    The member must register thecredit cardin the payment system.

    The member must select apayment method (monthly or annual).

    The member mustaccept the terms and conditionsfor the selected method.

    If terms and conditions are accepted, the system sends anOTP(one-time password) to the member’s phone for verification.

    The payment method isregistered only after OTP verification.

    Once the payment method is registered, the system will charge on the first business day of the following month.

Test Cycle Results:

    Members successfully paid dues using the credit card.

    Payments were processedmonthly and for over a year.

Which ONE of the following options identifies the acceptance criteria that has NOT been fully covered?

Options:

A.

Acceptance criteria 8 has not been fully covered during the above test cycle.

B.

Acceptance criteria 4 has not been fully covered during the above test cycle.

C.

All acceptance criteria have been fully covered during the above test cycle.

D.

Acceptance criteria 6 has not been fully covered during the above test cycle.

Questions # 90:

Which of the following would be LEAST appropriate as part of an incident report covering the observation of a failure during testing?

Options:

A.

SOL injection into the username entry field allowed a variety of SQL commands to be executed by the application without the appropriate authority.

B.

The user interface was complicated and confusing and I found It quite difficult to follow

the test script.

C.

The updates made as part of the add new member' function did not reflect the expected change as the name was written into the address field.

D.

The expected result for the ‘list friends' response time was less than 10 seconds, whereas the average response time obtained was 13 seconds.

Viewing page 9 out of 13 pages
Viewing questions 81-90 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.