Weekend Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70

Pass the USGBC Leadership in Energy and Environmental Design (LEED) LEED-AP-ID+C Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam LEED-AP-ID+C Premium Access

View all detail and faqs for the LEED-AP-ID+C exam


386 Students Passed

92% Average Score

91% Same Questions
Viewing page 1 out of 3 pages
Viewing questions 1-10 out of questions
Questions # 1:

A tenant is targeting LEED Platinum certification and has hired a LEED AP Interior Design and Construction consultant to help identify and use opportunities to achieve synergies across disciplines and building systems.

Which of the following analyses are required to be completed in the Integrated Process Worksheet to achieve an additional point?

Options:

A.

Water-Related Systems

B.

Energy-Related Systems

C.

Indoor Air Quality Systems

D.

Waste Management Systems

Questions # 2:

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

Options:

A.

documenting LEED credits

B.

creating the Basis of Design

C.

developing the LEED Scorecard

D.

implementing the Commissioning Plan

Questions # 3:

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

Options:

A.

be advertised as LEED compliant

B.

be both water efficient and high performing

C.

comply with mandatory federal government regulations

D.

comply with all international plumbing system requirements

Questions # 4:

A project consists of both retail and office space. When deciding which LEED Interior Design and Construction rating system to use, the LEED AP should follow which of the following rules?

Options:

A.

If a rating system is appropriate for less than 50% of the gross area of the LEED project space, then the rating system should not be used

B.

If a rating system is appropriate for more than 50% of the gross floor area of LEED project space, then that rating system should be used

C.

If a rating system is appropriate for 50% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

D.

If a rating system is appropriate for 40% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

Questions # 5:

A project team wants to achieve Materials and Resources Credit, Building Product Disclosure and

Optimization - Material Ingredients. By what means can a product demonstrate their material ingredient optimization?

Options:

A.

Green Seal

B.

Manufacturer Inventory

C.

GreenScreen v1.2 Benchmark

D.

Chemical Abstract Service Registration Number (CASRN)

Questions # 6:

A project team is implementing a strategy that controls the admission of natural light into the office space being developed. To which credit can this contribute?

Options:

A.

Indoor Environmental Quality Credit, Interior Lighting

B.

Indoor Environmental Quality Credit, Thermal Comfort

C.

Energy and Atmosphere Credit, Advanced Energy Metering

D.

Energy and Atmosphere Credit, Optimize Energy Performance

Questions # 7:

A tenant is soliciting proposals for a Commissioning (Cx) agent for Energy and Atmosphere Credit, Enhanced Commissioning. Which qualification must the agent meet?

Options:

A.

Subcontractor of construction manager

B.

Not an employee of the project design firm

C.

Member of the Building Cx Association

D.

Commissioning Authority (CxA) with experience in at least one prior project

Questions # 8:

The site of a new open-plan office building is located near a highway. The acoustic consultant is investigating the possibility of using sound masking system to cover the noise impact from the busy road. If sound masking is found to be a feasible option, the noise design of the project can have a maximum limit up to

Options:

A.

36 dBA

B.

48 dBA

C.

62 dBA

D.

70 dBA

Questions # 9:

Which systems must be commissioned to earn Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?

Options:

A.

Fire suppression

B.

Irrigation controls

C.

Building Envelope

D.

Daylighting controls

Questions # 10:

In a goal-setting workshop, a project team identifies that teleworking could reduce building area and therefore the required plug loads. What is a requirement for the documentation of the energy-related systems of the Integrative Process worksheet?

Options:

A.

Providing a narrative of one plug load reduction

B.

Providing calculations of only the plug load reduction

C.

Providing explanations of at least two plug load reduction strategies

D.

Providing detailed comparative energy model before completing schematic design to evaluate energy load reduction strategies

Viewing page 1 out of 3 pages
Viewing questions 1-10 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.