A project has performed an energy model which has resulted in the following energy end use consumption:

To meet the requirements for Energy and Atmosphere Credit, Advanced Energy Metering, Option 2. Advanced Metering, energy meters must be installed for energy end uses in
A tenant moves into an existing building where no modifications to the building envelope will be made. What credit would be affected by the visible light transmittance of the existing exteriorglazing?
In addition to the Material Type, what other information needs to be included in the Construction and Demolition Waste Management Calculation?
A mechanical engineer needs to identify spaces that are considered densely occupied according to LEED in order to document
The project architect suggests reducing the area planned for surface parking and replacing it with additional green space. What benefit would this strategy provide to the owner?
Using the scale of 0 = no view and 5 = maximum view, what is the view factor in the diagram below, as defined in Indoor Environmental Quality Credit, Quality Views?

After the construction and installation of all finishes and furnishing of a new 36,000 ft2 (3 344.5m2) office space, what is the minimum total volume of outdoor air that is required during a non-phased flush-out procedure to achieve Indoor Environmental Quality Credit, Indoor Air Quality Assessment?
Based on the results of a six-hour waste stream study, the team for an Interior Design and Construction Retail project plans to provide dedicated areas for four recyclable waste streams: cardboard, plastic, metal, and paper.
The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite, Storage and Collection of Recyclables?
Drywall is purchased from a local manufacturer for a total materials cost of $10,000 USD. The specification of the drywall is:
· 5% of the product is comprised of post-consumer recycled paper sourced from a pulp mill 25 mi. (40 km) away;
· 50% of the product is post-consumer recycled gypsum attained from a facility 30 mi. (48 km) away;
· new gypsum is extracted from a mine 175 mi. (282 km) away.
What is the contributing value of the drywall to Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?
To determine the area of interior nonstructural elements, the LEED AP will include which one of the following in the calculation for Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse?