Weekend Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70

Pass the WELL Accredited Professional WELL-AP Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam WELL-AP Premium Access

View all detail and faqs for the WELL-AP exam


397 Students Passed

96% Average Score

96% Same Questions
Viewing page 1 out of 7 pages
Viewing questions 1-10 out of questions
Questions # 1:

A WELL AP is communicating the recertification requirements to the project owner. Which is the best strategy to simplify the process?

Options:

A.

Submit all reports prior to applying for recertification

B.

Hire an approved WELL Performance Testing Agent to conduct recertification pre-testing

C.

Prepare a file of the maintenance logs and reports for recertification prior to the WELL Performance Testing Agent's site visit

D.

Use an approved WELL Performance Testing Agent to conduct ongoing monitoring of environmental parameters for recertification

Questions # 2:

Along with turbidity, which parameter requires a performance test in bathroom faucets?

Options:

A.

Mercury

B.

Benzene

C.

Coliforms

D.

Trihalomethane

Questions # 3:

Which of the following must be provided to all eligible employees within a WELL Certified Building?

Options:

A.

Long-term leave or disability for mental health needs with the option of phased return to work

B.

Crisis consoling or trauma-focused psychotherapy with qualified mental health professionals

C.

Psychological first aid (PFA) training offered by mental health professionals to any employee and required for managers

D.

Annual communication addressing all mental health and well-being benefits, resources and programs available through the protect or organization

Questions # 4:

A WELL AP is monitoring the ongoing submission of documents required for a WELL Certified project. Which strategy should the WELL AP use to ensure the requirements are met?

Options:

A.

Collect the appropriate documents annually and submit them through email

B.

Collect and submit all required documents at the 18 and 36 month marks of certification

C.

Collect and submit all required documents within 15 months of certification and every 12 months thereafter

D.

Develop a schedule with the project owner to collect the right information on an ongoing basis and submit every three years through the WELL digital platform

Questions # 5:

An office pursuing WELL Certification offers no-cost group fitness classes (30 minutes, twice per week) and is pursuing V06: Physical Activity Opportunities for one point. The company's benefits package also includes a subsidy for employees to set individual physical activity and exercise goals and prizes when employees accomplish their goals. The project is hoping to use this to meet another feature. What other feature can the WELL AP recommend to this project based on the offerings in the benefits package?

Options:

A.

V03: Circulation Network

B.

V09: Physical Activity Promotion

C.

V08: Physical Activity Spaces and Equipment

D.

C07: Enhanced Health and Well-Being Promotion

Questions # 6:

The facilities management team of a project has ordered a cleaning product that can harm occupants' health. A review of the documentation shows that the team members were unaware of the cleaning plan at the time of the purchase. What is the most likely cause of the misunderstanding?

Options:

A.

Facilities management's goals were not discussed at the initial meeting

B.

Communication between project team and facilities management team was collaborative

C.

Project team expected the facilities management team had a clear understanding of the health and well-being goals

D.

Project goals for health and well-being were overlooked during the initial discussion with the facilities management team

Questions # 7:

Which of the following techniques is used to remove pollutants that were introduced indoors during construction prior to occupancy?

Options:

A.

Using low-VOC paints

B.

Performing an air flush

C.

Protecting absorptive materials

D.

Installing permanent walk-off mats

Questions # 8:

Please click on the Project Scenario B button to review the project scenario and answer the following question.

BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.

The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.

The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.

Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.

Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.

PROJECT SCOPE & GOALS

Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.

As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.

The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.

Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.

Although the current MERV 11 filters in the return air ducts contribute toward compliance with Feature A04:

Construction Pollution Management, the installation of MERV 14 filters could help to achieve which additional feature?

Options:

A.

Feature A12: Air Filtration

B.

Feature A13: Enhanced Supply Air

C.

Feature A06: Enhanced Ventilation Design

D.

Feature A09: Pollution Infiltration Management

Questions # 9:

The office manager has received several complaints that staff who use the boardroom can clearly hear and understand conversations that take place in the adjacent corridor. What is the likely cause of this acoustic issue?

Options:

A.

Exposed soffits in the corridor

B.

Hollow core door separating me spaces

C.

Timber flooring installed in the boardroom

D.

Water pipes that run through the boardroom and corridor

Questions # 10:

Which of the following hazardous materials is known to impair the intellectual development of children and the unborn during pregnancy?

Options:

A.

Load

B.

Arsenic

C.

Mercury

D.

Asbestos

Viewing page 1 out of 7 pages
Viewing questions 1-10 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.