Questions # 31:

An Environment, Health and Safety (EHS) manager finds that the air quality at an indoor construction site is degrading because the contractors are demolishing wooden boards. Which step should the manager take first to address this problem?

Options:

A.

Clean and seal all the ducts

B.

Use walk-off mats at entryways

C.

Use saws with dust guards or collectors

D.

Install media filters with a PM10 removal rating

Questions # 32:

A WELL Cote building project wishes to challenge the findings of a WELL report. Which of the following steps should the protect team take?

Options:

A.

Submit an appeal

B.

Submit for equivalency

C.

Submit for recertification

D.

Submit a curative action plan

Questions # 33:

A project has just undergone performance testing Which of the following results meets the air quality threshold requirement in WELL Certification?

A)

Question # 33

B)

Question # 33

C)

Question # 33

D)

Question # 33

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Questions # 34:

An office building is at the design stage. The client has the goal of achieving acceptable thermal environment for building occupants. Which of the following strategies should the WELL AP suggest to address this goal and meet the requirements of a WELL feature?

Options:

A.

Utilize natural conditioning when the prevailing mean outdoor temperature is 48°F (9C)

B.

Design a radiant ceiling, wall or floor heating/cooling system for at least 45% of the regularly occupied project area

C.

Include real-time displays of dry-bulb temperature and relative humidity for 50% of regularly occupied spaces and make available to occupants through display screens

D.

Design mechanically conditioned regularly occupied spaces to meet predicted mean value range of +/- 0.5 for at least 90% of occupied hours and regularly occupled spaces

Questions # 35:

Which of the following hazardous materials have been restricted for use in paints in many countries?

Options:

A.

Volatile organic compounds (VOCs) and lead

B.

Cadmium and polychlorinated biphenyls (PCB)

C.

Orthophthalates and per- and polyfluoroalkyl substances (PFASs)

D.

Halogenated flame retardants (HFRs) and perfluorinated alkyl compounds (PFCs)

Questions # 36:

A project team is evaluating products to meet Feature X07: Materials Transparency, Part 1: Select Products with Disclosed Ingredients. What strategy should the team take to ensure products meet this feature's requirements?

Options:

A.

Identify products that meet ANSI/BIFMA e3-2014

B.

Identify products that are subject to SCAQMD Rule 1168

C.

Identify products that have a Health Product Declaration (HPD)

D.

Identify products that comply with California Department of Public Health (CDPH) orilorio

Questions # 37:

A project team tested their building water supply and found high levels of organic contaminants present. The level detected exceeds the threshold prescribed by the WELL Building Standard™ (WELL™). At minimum, which of the following plumbing fixtures/systems will the project team be required to address?

Options:

A.

Irrigation systems

B.

Drinking water dispensers

C.

Mechanical cooling towers

D.

Entire building water supply

Questions # 38:

A project in a defined WELL Portfolio achieved all 24 preconditions and 60 points through optimizations. How many total points can this project contribute toward the WELL Portfolio Score?

Options:

A.

24 points

B.

42 points

C.

60 points

D.

84 points

Questions # 39:

A developer wants to complete WELL Certification quickly for a WELL Core office building. The WELL documentation is approved for the project, the base building is complete, but the building is not yet occupied. Which step should the project team take first to address the developer's goal?

Options:

A.

Apply for the certificate of occupancy (CO)

B.

Determine the schedule for the tenants finish-out and move-in

C.

Inform the developer that performance verification requires at least 50% occupancy

D.

Schedule performance verification since all pre-verification requirements are

Questions # 40:

As a part of a new initiative of a hospital, the program leader is targeting Feature C11: Civic Engagement. Which of the following policies should be implemented to support this endeavor?

Options:

A.

Coordinate a volunteer opportunity once a year

B.

Provide eight hours of paid time for community involvement annually

C.

Contribute annually to a registered charity program to match employee donations

D.

Plan a pre-paid workshop event to educate the community on health and well-being