Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the WELL Accredited Professional WELL-AP Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam WELL-AP Premium Access

View all detail and faqs for the WELL-AP exam


742 Students Passed

88% Average Score

96% Same Questions
Viewing page 6 out of 7 pages
Viewing questions 51-60 out of questions
Questions # 51:

A project's interior designer is designing a room that will act as a restorative space for future employees to break from work and relax. The space will be at least 75 ft2 (7 m2) plus 1 ft2 (0.1 m2) per regular occupant. It will also include features like dimmable lighting, sound masking and calming colors. What additional element(s) should the interior designer incorporate to contribute towards meeting the requirements of the respective WELL optimization?

Options:

A.

A mindfulness training course by a qualified instructor

B.

A room-booking system for staff to reserve time to use the room

C.

Activity accessories, such as yoga mats, weights or exercise balls

D.

Signage or education materials explaining the intended use of the space

Questions # 52:

A WELL project for a first recertification elects to be reviewed under the version for which it achieved initial certification. Under which of the following will the project be reviewed for subsequent recertifications?

Options:

A.

Same version as initial certification

B.

Version in place at the time of performance verification

C.

Version released at the time of project's first recertification

D.

Version in place 12 months prior to expiration of project's certification

Questions # 53:

For an office project lo earn one point in Feature L03 Orcadian Lighting Design what level of equivalent melanopic lux (EMI) needs to be achieved at workstations in regularly occupied spaces and which piano should the light be achieved on?

Options:

A.

At least 100 EML; measured on the vertical plane

B.

At least 150 EML; measured on the vertical vertical

C.

At least 100 EML; measured on the horizontal plane

D.

At least 150 EML; measured on the horizontal plane

Questions # 54:

An organic coffee shop would like to establish an internal policy to support healthy working hours for staff to meet Feature M06: Restorative Opportunities. Which of the following strategies should be addressed?

Options:

A.

A minimum 24-hour advance notice of shift changes

B.

A minimum of 15 days with paid time off per calendar year

C.

A minimum of 24 consecutive hours off from work per 10-day period

D.

A minimum of 11 consecutive hours off from work per 24-hour period

Questions # 55:

What type of test should a building owner use to assess the building envelope's performance in regard to moisture protection?

Options:

A.

Water pH test

B.

Isotope tracing

C.

Air tightness test

D.

Mold spore sampling

Questions # 56:

There is an office building with a regularly occupied project area of 25.000 ft2 (2 322 m2). In which the owner wants to implement radiant heating and cooling to achieve a higher level of thermal comfort for the occupants To meet Feature T05 Radiant Thermal Comfort, what is the minimum area that must be serviced by radiant heating or cooling?

A)

Question # 56

B)

Question # 56

C)

Question # 56

D)

Question # 56

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Questions # 57:

In an office building where all of the occupants are under the age of 65 years, which of the following illuminance levels meets the requirements for the office area?

Options:

A.

10 fc (110 lux) at floor level

B.

10 fc (110 lux) at task surface

C.

30 fc (320 lux) at floor level

D.

30 fc (320 lux) at task surface

Questions # 58:

A project administrator is preparing documentation for a project's submittal. In addition to the Letters of Assurance, what other documents must the project administrator submit to support the features being pursued?

Options:

A.

Survey data

B.

Annotated documents

C.

Certificate of occupancy

D.

Air and water testing results

Questions # 59:

In addition to Feature M02: Nature and Place, the installation of potted plants and an indoor water fountain could contribute to the achievement of which other features?

Options:

A.

Feature M01: Mental Health Promotion and Feature M07: Restorative Spaces

B.

Feature M07: Restorative Spaces and Feature M09: Enhanced Access to Nature

C.

Feature M01: Mental Health Promotion and Feature M08: Restorative Programming

D.

Feature M08: Restorative Programming and Feature M09: Enhanced Access to Nature

Questions # 60:

During a project review meeting, a member of the facility management team states that asbestos containing materials (ACMs) may be present within the project boundary. What strategy should the project team follow to evaluate this issue?

Options:

A.

Notify any building occupants about the risk of ACMs

B.

Create an asbestos action plan to remediate the ACMs and schedule ongoing inspections

C.

Obtain a letter from the building owner affirming there are no known ACMs in the project boundary

D.

Hire a qualified inspector to investigate the project boundary and space to determine whether ACMs are present

Viewing page 6 out of 7 pages
Viewing questions 51-60 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.