Weekend Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70

Pass the USGBC Leadership in Energy and Environmental Design (LEED) LEED-AP-BD+C Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam LEED-AP-BD+C Premium Access

View all detail and faqs for the LEED-AP-BD+C exam


354 Students Passed

86% Average Score

96% Same Questions
Viewing page 1 out of 11 pages
Viewing questions 1-10 out of questions
Questions # 1:

A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?

Options:

A.

$75

B.

$150

C.

$750

D.

$1,500

Questions # 2:

A downtown office building is unable to construct dedicated parking for its occupants. However, the building developer has partnered with a parking garage to offer discounted parking for its occupants. If the discounted parking rate is $450 per month, how much must the rate be for green vehicles for the building to receive one point for Location and Transportation Credit, Green Vehicles?

Options:

A.

$90

B.

$225

C.

$360

D.

$405

Questions # 3:

Which of the following groups of documents is most likely to support both Indoor Environmental Quality Credit,

Thermal Comfort, and Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

Options:

A.

Architectural floor plans, mechanical plans, lighting plans

B.

Photometric plans, mechanical schedules, lamp specifications

C.

Lighting plans, surveys of occupants, sequence of operations

D.

Surveys of occupants, photometric plans, mechanical schedules

Questions # 4:

Which of the following credits can be awarded an Innovation point for Exemplary Performance?

Options:

A.

Indoor Environmental Quality Credit, Daylight

B.

Indoor Environmental Quality Credit, Low-Emitting Materials

C.

Indoor Environmental Quality Credit, Minimum Indoor Air Quality Performance

D.

Indoor Environmental Quality Credit, Acoustic Performance

Questions # 5:

Large commercial buildings are most often dominated by

Options:

A.

internal loads

B.

lighting loads

C.

external loads

D.

envelope loads

Questions # 6:

If a commercial building is considered to have 100 peak visitors in a day, what is the minimum number of short-term

bicycle storage spaces that must be provided to earn one point under Location and Transportation Credit, Bicycle

Facilities?

Options:

A.

Three

B.

Four

C.

Five

D.

Ten

Questions # 7:

What type of lighting can be used for 25% or less of the total connected lighting load for all regularly occupied spaces as a strategy to improve lighting quality?

Options:

A.

Low-mercury lighting

B.

Direct-only overhead lighting

C.

Light sources with a CRI of 80 or higher

D.

Low fixture glare

Questions # 8:

When following the LEED Building Design and Construction Integrative Process credit, which of the following is the approach for the design team to follow?

Options:

A.

Locate a solid waste provider that has sorting capabilities

B.

Assure the aesthetics will match existing neighborhood conditions

C.

Identify synergies among building systems and equipment

D.

Determine if green vehicles will be applicable to the project

Questions # 9:

Which of the following is a source reduction strategy to eliminate waste produced by a project?

Options:

A.

Custom design

B.

Design-build

C.

Material science

D.

Prefabrication

Questions # 10:

A new commercial building is being designed to use small capacity air handling units. To meet the requirements of the Carbon Dioxide Monitoring strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Environmental

Quality Strategies, where would CO2 monitors need to be located?

Options:

A.

In each occupied space

B.

In each densely occupied space

C.

In each occupied space and outdoors

D.

In each occupied space over 500 ft2 (46 m2)