Viewing page 6 out of 11 pages
Viewing questions 51-60 out of questions
Questions # 51:

When preparing the Sustainable Sites Prerequisite, Construction Activity Pollution Prevention, the Construction General Permit must contain which of the following?

Options:

A.

Waste Management Plan

B.

Building orientation on the site

C.

Installation plan for perimeter control

D.

Minimum standards for equipment exhaust

Questions # 52:

What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?

Options:

A.

Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided

B.

Retail projects must conduct a waste stream audit once a month for the project in an existing or rented location or make projections based on data gathered from a previous cycle. Identify the top-three recyclable waste streams while stating the top-two waste streams where both collection and storage space will be provided

C.

Retail projects must conduct a waste stream audit twice a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

D.

Retail projects must conduct a waste stream audit for the once a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

Questions # 53:

An HVAC system consists of an air handler supplying conditioned air (mixture of return air and outdoor air) to an office, corridor, conference room and lobby. For Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance, the ventilation rate procedure calculations must be based upon what HVAC system configuration?

Options:

A.

Single-zone system

B.

Multiple-zone system

C.

Mixed-mode system

D.

100% outdoor air system

Questions # 54:

For an emergency care facility project, which of the following credits can be achieved if the total cost of

permanently installed products are 25% cradle-to-cradle V3 Gold and 25% GreenScreen List Translator?

Options:

A.

Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Material Reuse

& Innovation Credit, Innovation, Exemplary Performance

B.

Materials and Resources Credit, Furniture and Medical Furnishing, Option 3. Multi-Attribute Assessment of

Products & Innovation Credit, Innovation, Exemplary Performance

C.

Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2.

Material Ingredient Optimization & Innovation Credit, Innovation, Exemplary Performance

D.

Materials and Resources Credit, Furniture and Medical Furnishings, Option 3. Multi-Attribute Assessment of

Products & Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2. Material Ingredient Optimization

Questions # 55:

A LEED AP is evaluating whether Indoor Environmental Quality Credit, Acoustic Performance is feasible for a LEED

AP Building Design and Construction: Healthcare project. Which of the following groups of documents would best inform this decision?

Options:

A.

Airport flyover maps, mechanical plans, wall sections

B.

Patient records, wall sections, ceiling panel cut sheets

C.

Occupancy statistics, patient records, MRI machine specifications

D.

MRI machine specifications, mechanical plans, occupancy statistics

Questions # 56:

The LEED AP is leading the first design charrette for a new LEED project with the project's owners. What document should be used to record the project goals to be used throughout the design of the project?

Options:

A.

Owner's Project Requirements (OPR)

B.

Owner's list of wants and needs

C.

Criteria for contractor selection

D.

Basis of Design (BOD)

Questions # 57:

A rectangular office building is located in an extremely humid climate and is shaded by very large adjacent buildings

on all four sides. If the building owner wants to decrease the annual energy cost for operating the building, which of

the following would be the best design approach?

Options:

A.

Install glazing with a higher solar heat gain factor

B.

Install photovoltaic panels on the sides of the building

C.

Increase outdoor air intake quantities during summer months

D.

Recover waste energy through exhaust air energy recovery systems

Questions # 58:

What stage of LEED for Neighborhood Development certification listed below is eligible for points under Building Design and Construction: New Construction, Location and Transportation Credit, LEED for Neighborhood Development Location?

Options:

A.

LEED v4, LEED for Neighborhood Development Conditional Approval

B.

LEED for Neighborhood Development Pilot, Stage 3 LEED for Neighborhood Development Certified Project

C.

LEED for Neighborhood Development Pilot, Stage 1 LEED for Neighborhood Development Pre-reviewed Plan

D.

LEED 2009, Stage 1 Conditional Approval of LEED for Neighborhood Development Plan

Questions # 59:

Which of the following strategies would be considered an acceptable minor improvement within the wetland buffer for Location and Transportation Credit, Sensitive Land Protection?

Options:

A.

Build a two-story fitness facility

B.

Change the grade to install a security fence

C.

Provide a vehicular access drive that is less than 16 ft. (5 m) in width

D.

Remove trees that are less than 6 inches (15.24 cm) diameter at breast height

Questions # 60:

Which of the following are all considered regular building occupants?

Options:

A.

Staff, primary/secondary students, volunteers, and residents

B.

Staff, primary/secondary students, higher education students, and residents

C.

Higher education students, retail customers, periodic volunteers, and visitors

D.

Residents, volunteers, retail customers, and staff

Viewing page 6 out of 11 pages
Viewing questions 51-60 out of questions