Viewing page 9 out of 11 pages
Viewing questions 81-90 out of questions
Questions # 81:

A comprehensive rainwater management plan may include design elements such as

Options:

A.

artificial turf, bioretention pond, cisterns and hay bales

B.

cisterns, porous pavement, swales and vegetated roofs

C.

soil compaction, swales, vegetated roofs and xeriscaping

D.

bioretention pond, cisterns, porous pavement and stabilized construction entrance

Questions # 82:

For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include

Options:

A.

verification that a weighted daily average has been used for each qualifying route

B.

confirmation that functional entries of the project are within 3/4 mi. (1.20 km) of the stop

C.

verification that a weighted building average has been used for each qualifying functional entry

D.

confirmation that each qualifying route features paired route service (service in opposite directions)

Questions # 83:

Green Infrastructure (GI) and Low-Impact Development (LID) rainwater management strategies improve upon the conventional approach for rainwater management by

Options:

A.

replicating a site's natural hydrology

B.

discharging rainwater at a faster rate

C.

increasing a site's impervious surface

D.

providing a greater volume of rainwater detention

Questions # 84:

A project elects to pursue Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses because of the project's location in an amenity-rich area. The project features 18 uses overall, including at least four uses in three of the five use type categories. What threshold must the project surpass in order to demonstrate exemplary performance for Option 2?

Options:

A.

Exemplary Performance is not available for Option 2

B.

15 uses, including two uses in each of the five categories

C.

15 uses, including at least one Food Retail and one Community Anchor use

D.

18 uses, including uses in at least four of the five use type categories

Questions # 85:

A project team is attempting Location and Transportation Credit, High Priority Site, and selects Option 1: Historic District. To demonstrate that the project is in an infill site, the project team must confirm that:

Options:

A.

At least 75% of qualifying land areas within ¾ mile (1.20 km) are previously developed

B.

At least 75% of qualifying land areas within ½ mile (0.80 km) are previously developed

C.

The site is a brownfield as defined by the Environmental Protection Agency (EPA)

D.

The project is a Federal Renewal Community site

Questions # 86:

Which of the following is required in determining the baseline for Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Duration of use

B.

Building floor area

C.

Make and model of fixtures

D.

Proposed design fixture flow rates

Questions # 87:

When calculating the reverberation time of a room, which of the following pieces of information is least relevant?

Options:

A.

Height and width of room

B.

Noise reduction coefficient of the ceiling surface

C.

Sound absorption coefficient of the floor surface

D.

Operating sound level of nearest HVAC equipment

Questions # 88:

A construction manager is looking for a project management tool that offers energy management strategies, benchmarking software tools for buildings, and product procurement guidelines. Which of the following is recognized by U.S. Green Building Council to assist them?

Options:

A.

Green Seal

B.

SCAQMD

C.

ENERGY STAR®

D.

SMACNA

Questions # 89:

Which of the following could be considered diverted construction waste?

Options:

A.

Excavated soil

B.

Land-clearing debris

C.

Alternative daily cover

D.

Asphalt with aggregate

Questions # 90:

What issue must be present on the project site to achieve Location and Transportation Credit, High-Priority Site, Option 3. Brownfield Remediation?

Options:

A.

Mercury containing lamps

B.

Contaminated soil or groundwater

C.

Asphalt construction waste

D.

Asbestos tile and glue

Viewing page 9 out of 11 pages
Viewing questions 81-90 out of questions