Pre-Winter Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the USGBC Leadership in Energy and Environmental Design (LEED) LEED-AP-BD+C Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam LEED-AP-BD+C Premium Access

View all detail and faqs for the LEED-AP-BD+C exam


671 Students Passed

92% Average Score

96% Same Questions
Viewing page 12 out of 14 pages
Viewing questions 111-120 out of questions
Questions # 111:

Showers are addressed under which prerequisites and/or credits within LEED Building Design and Construction?

Options:

A.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Credit, Indoor Water Use Reduction; and Location and Transportation Credit, Bicycle Facilities

B.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Prerequisite, Outdoor Water Use Reduction; and Water Efficiency Credit, Water Metering

C.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Prerequisite, Outdoor Water Use Reduction; and Location and Transportation Credit, Bicycle Facilities

D.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Credit, Cooling Tower Water Use; and Water Efficiency Credit, Water Metering

Questions # 112:

A LEED Building Design and Construction: Schools project pursuing Location and Transportation Credit, Green Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles. What action must the project take to meet the Option 2 requirements?

Options:

A.

Install a preferred drop-off lane for buses meeting the emission requirements

B.

Provide calculations showing that the average fleet bus meets the emission requirements

C.

Inventory the school fleet to develop and create a plan for all buses to meet the emission requirements

D.

Document that all buses serving the project achieve a minimum green score of 30 on the American Council for an Energy Efficient Economy (ACEEE) annual vehicle rating guide

Questions # 113:

What supporting material is required for all LEED Building Design and Construction projects in order to document Location and Transportation Credit, Bicycle Facilities for the bicycle network?

Options:

A.

Photographs of bicycle network signage and directional signposts

B.

Photographs of the installed bicycle storage and shower facilities

C.

Vicinity map showing bicycle network, route and distance along network to eligible destination(s)

D.

Manufacturer specifications for the chosen bicycle storage facilities, including the number of bicycles supported by each bike rack

Questions # 114:

The Exemplary Performance threshold for Sustainable Sites Credit, Rainwater Management requires:

Options:

A.

Utilizing a rain garden to manage the 98th percentile rainfall event

B.

Managing 100% of rainfall that falls within the project boundary

C.

Achievement of both Option 1. Percentile of Rainfall Events and Option 2. Natural Land Cover Conditions

D.

Utilizing a combination of both structural and non-structural measures to manage the 98th percentile rainfall event

Questions # 115:

In an area where carbon-emission regulations are becoming progressively stricter, the goal is to future-proof the building for complete electrification and eliminate on-site fossil-fuel combustion. Which of the following measures can the project team use to maximize the building’s readiness for electrification while minimizing on-site combustion sources?

Options:

A.

Install natural-gas boilers as a backup heating source

B.

Plan for an electric heat-pump water-heating system

C.

Integrate rooftop solar panels to generate renewable electricity on-site

Questions # 116:

Location and Transportation Credit, Reduced Parking Footprint calculations must include

Options:

A.

motorbike spaces

B.

on-street parking in public rights-of-way

C.

parking within 1/4 mi. (0.40 km) radius of the project boundary

D.

parking outside the project boundary but used by the project

Questions # 117:

A project team is designing an office building and wants to ensure thermal comfort for occupants, especially in naturally conditioned spaces. How should the design team enhance thermal comfort in the naturally conditioned areas?

Options:

A.

Introduce radiant heating panels

B.

Increase air speed

C.

Use low-emissivity windows

Questions # 118:

A topographic assessment of a project site located 150 ft. (45 m) from a water body was conducted. The results of the slope analysis show that the site is generally sloping 6% to 8% to the northwest over most of the site, with some steep slopes located at the eastern edge of the property, which may impact the runoff volume. Which one of the following LEED credits or prerequisites will be affected by these results?

Options:

A.

Sustainable Sites Credit, Rainwater Management

B.

Sustainable Sites Prerequisite, Environmental Site Assessment

C.

Location and Transportation Credit, Sensitive Land Protection

D.

Location and Transportation Credit, High-Priority Site

Questions # 119:

What type of space should a project team ensure is made available in order to attain the Sustainable Sites Credit, Joint Use of Facilities, Option 1: Make Building Space Open to the General Public?

Options:

A.

Locker rooms

B.

Office of the principal

C.

Health clinic

D.

Auditorium

Questions # 120:

A tenant of a new office building will require 100 workstations per floor. Each floor will have two bathroom facilities and one conference room. How many lighting control devices with at least three lighting levels per floor are required to comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

Options:

A.

91 lighting control devices

B.

93 lighting control devices

C.

100 lighting control devices

D.

103 lighting control devices