Pre-Winter Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the USGBC Leadership in Energy and Environmental Design (LEED) LEED-AP-BD+C Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam LEED-AP-BD+C Premium Access

View all detail and faqs for the LEED-AP-BD+C exam


671 Students Passed

92% Average Score

96% Same Questions
Viewing page 13 out of 14 pages
Viewing questions 121-130 out of questions
Questions # 121:

During a design charrette, community neighbors raise a concern about potential glare resulting from a project's highly reflective roof. Which option should the LEED AP recommend to best address these concerns?

Options:

A.

Install a vegetative roofing system

B.

Change the design to reduce the amount of roofing area

C.

Change the roofing material to a dark material to eliminate the issue

D.

Increase the parapet height

Questions # 122:

Which of the following is required to earn Energy and Atmosphere Credit, Renewable Energy Production if using a Solar Photovoltaic System?

Options:

A.

Carbon offsets

B.

Daylighting strategies

C.

Passive solar strategies

D.

Produced electricity consumed on-site

Questions # 123:

When a project team sustainably develops a project site, the design should

Options:

A.

increase water runoff

B.

maximize construction pollution

C.

remediate sites already in decline

D.

replace natural water flow patterns

Questions # 124:

A rectangular office building is located in an extremely humid climate and is shaded by very large adjacent buildings

on all four sides. If the building owner wants to decrease the annual energy cost for operating the building, which of

the following would be the best design approach?

Options:

A.

Install glazing with a higher solar heat gain factor

B.

Install photovoltaic panels on the sides of the building

C.

Increase outdoor air intake quantities during summer months

D.

Recover waste energy through exhaust air energy recovery systems

Questions # 125:

Which of the following statements is correct when defining the project boundary?

Options:

A.

The LEED project boundary cannot include non-contiguous land

B.

The LEED project boundary cannot include more than one building

C.

The land associated with the project supports typical operation

D.

The gross floor area of the LEED project should be no less than 1% of the gross land area within the LEED project boundary

Questions # 126:

Which of the following plumbing fixtures apply to the calculations in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Toilets, urinals, pre-rinse spray valves

B.

Toilets, private lavatory faucets, dishwashers

C.

Urinals, public lavatory faucets, kitchen sink faucets

D.

Urinals, showerheads, commercial kitchen filling operations faucets

Questions # 127:

Which of the following innovation proposals is most likely to be successful to achieve an Innovation Credit?

Options:

A.

Providing an educational program on the environmental and human health benefits of green building practices

B.

Including locked, indoor bicycle storage for 100% of project occupants

C.

Being located next to a 20 mi. (32 km) award-winning bicycle trail

D.

Distributing leaflets to project occupants about available public transit services nearby

Questions # 128:

What type of space must have self-closing doors, deck-to-deck partitions, and exhaust fans in order to meet the requirements for Indoor Environmental Quality Credit, Enhanced Air Quality Strategies?

Options:

A.

Data closet

B.

Conference room

C.

Chemical storage

D.

Open office

Questions # 129:

A project includes an automatic transfer switch and controls that enable the building’s on-site renewable-energy systems, energy storage, and critical equipment to operate during a power outage. What is this capability called?

Options:

A.

Load management

B.

Islanding

C.

Demand response

Questions # 130:

A design team is working on a hospital project. In order to meet the Energy and Atmosphere Prerequisite, Minimum

Energy Performance, what option is used?

Options:

A.

Whole building simulation

B.

EPA target finder rating tool

C.

Green-e Energy

D.

Advanced building core performance guide

Viewing page 13 out of 14 pages
Viewing questions 121-130 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.