Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the USGBC Leadership in Energy and Environmental Design (LEED) LEED-Green-Associate Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam LEED-Green-Associate Premium Access

View all detail and faqs for the LEED-Green-Associate exam


792 Students Passed

86% Average Score

94% Same Questions
Viewing page 6 out of 11 pages
Viewing questions 51-60 out of questions
Questions # 51:

A project has 16 employees working for four hours per day, 20 employees working six hours per day, and 10 employees working eight hours per day. What is the Full Time Equivalent (FTE) occupancy of the project?

Options:

A.

28

B.

33

C.

33

D.

46

Questions # 52:

An owner of newly acquired land wants to design a building that uses materials that have minimal impact on the environment. Which of the following strategies would help achieve this goal?

Options:

A.

Life-cycle assessment

B.

Life-cycle costingC Simple payback

C.

Environmental assessment

Questions # 53:

Which strategy can be used to reduce the amount of construction waste?

Options:

A.

Encourage recycling

B.

Specify regional materials

C.

Increase the use of recycled content

D.

Institute an off-site composting program

Questions # 54:

Open grid pavement tends to reduce

Options:

A.

native habitat

B.

heat island effects

C.

rainwater infiltration

D.

parking space requirements

Questions # 55:

Which of the following standard organizations support requirements for the Minimum Energy Performance Prerequisite and the Minimum Indoor Air Quality Performance Prerequisite?

Options:

A.

SMACNA

B.

International Code Council

C.

ASHRAE

D.

ENERGY STAR

Questions # 56:

Which action promotes pedestrian access to a project site?

Options:

A.

Placing a low speed limit in the parking lot around the building

B.

Providing shuttle access between the project site and a local transit center

C.

Designating parking spaces closest to the building for exclusive use by carpooling vehicles

D.

Utilizing an existing community nature path connecting the building to surrounding buildings

Questions # 57:

The Increase in air temperature in a developed area resulting from the dark surfaces of roadways, parking lots, and tarred rooftops is known as

Options:

A.

emissivity

B.

global warming

C.

greenhouse gas

D.

heat island effect

Questions # 58:

The LEED Project team performs an initial review that indicates 34 credit points can be achieved from the credit categories. How many additional points would result in the project achieving LEED Silver?

Options:

A.

10 additional points

B.

15 additional points

C.

20 additional points

D.

30 additional points

Questions # 59:

A wood product that is certified by the Forest Stewardship Council (FSC) is guaranteed to be

Options:

A.

grown in a tropical forest

B.

harvested from a well-managed source

C.

packaged with environmentally friendly materials

D.

purchased from a LEED AP

Questions # 60:

Which of the following third-party verification strategy contributes to environmentally preferable products?

Options:

A.

ASHRAE 90.1

B.

California's Title 24

C.

Green Buying Council

D.

Forest Stewardship Council

Viewing page 6 out of 11 pages
Viewing questions 51-60 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.